Similar Projects
Hollywood Boulevard Mixed Use
New Construction, Infrastructure - 290,712 SF
Design
$22,000,000 CJ est. value
Hollywood, FL 33020

Hollywood Boulevard Mixed Use
New Construction, Infrastructure - 290,712 SF
Design
$22,000,000 CJ est. value
Hollywood, FL 33020

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

Holiday Inn FTL / Fort Lauderdale
New Construction, Infrastructure
Post-Bid
$10,200,000 CJ est. value
Fort Lauderdale, FL 33316

40 - Year Repairs for Aquatic Complex, City Hall and Wastewater Plant
Results
Less than $700,000 est. value
Fort Lauderdale, FL

Construction of Roundabout - University Drive and Old Club Road
Results
Parkland, FL 33067

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Millennium Townhouses
New Construction, Infrastructure - 10,916 SF
Construction
$4,000,000 CJ est. value
Fort Lauderdale, FL 33305

RFQ - Redevelop the Existing East and West Buildings of the Fort Lauderdale Aquatic Complex
Demolition, New Construction, Infrastructure
Pending Verification
$70,900,000 CJ est. value
Fort Lauderdale, FL 33316

New River Central
New Construction, Infrastructure - 5,697 SF
Pending Verification
$125,000,000 CJ est. value
Fort Lauderdale, FL 33301

Polk Street Apartments
New Construction, Infrastructure - 42,228 SF
Design
$8,000,000 CJ est. value
Hollywood, FL 33020

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

Parking Modifications
Results
$559,000 est. value
Fort Lauderdale, FL 33315

Spirit Airlines Corporate Headquarters / Campus
New Construction, Infrastructure
Construction
$250,000,000 CJ est. value
Dania Beach, FL 33004

Homewood Suites by Hilton
New Construction, Infrastructure - 105,747 SF
Pending Verification
$10,000,000 CJ est. value
Fort Lauderdale, FL 33308

Last Updated 10/28/2022 05:34 AM
Project Title

Interchange Modification - SR-9/I-95

Physical Address View project details and contacts
City, State (County) Fort Lauderdale, FL 33301   (Broward County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge, Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected October 2022
Bids Due View project details and contacts
Estimated Value $31,058,595 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

04220805 Counties: Broward Road Name: SR-9/I-95 and SR-834/SAMPLE RD FR S OF NB Exit Ramp Limits: 86028000 Project(S): 43695815201(*) Federal Aid No: N/a Project(S): 43695815202 Federal Aid No: N/a Total Roadway Length: 13.024 Miles Contract Days: 622 Total Bridge Length: 0.038 Miles Total Proposal Length: 13.062 Miles Contract Execution Days: 10 Special Start Date: N/a Aquis/flexible Start Time: 120 The Improvements Under This Contract Consist of , but Are Not Limited to, Maintenance of Traffic (Regular, Vehicular Special Detour, Pedestrian/bicycle Special Detour, Radar Display), Earthwork Operations, Monitor Existing Structures (Inspection, Settlement, Vibration), Bridge (Removal, Prestressed I-beam, Expansion Joint, Drainage), Piling (Test, Prestressed), Concrete (Removal, Superstructure, Approach Slabs, Traffic Railing, Slope Pavement, Endwalls, Mitered End Section, Curb, Gutter, Traffic Separator, Barrier, Shoulder Barrier Wall, Sidewalk, Driveways), Retaining Wall System, Steel (Superstructure, Substructure, and Approach Slab Reinforcing, Mast Arm), Asphalt (Stabilization, Base, Milling, Resurfacing, Miscellaneous), Guardrail (General, Double-face, Transition, Removal, End Treatment), Aluminum (Pipe Handrail, Signal Pole), Traffic Monitoring Site, Signalization (Cable F&i, Cable Removal, Service Pole F&i, Service Pole Removal, Signal Pole F&i, Signal Pole Removal, Mast Arm F&i, Mast Arm Removal, Vehicular Signal F&i, Vehicular Signal Detection, Priority/exemption System, Vehicular Signal Removal, Pedestrian Signal, Pedestrian Detector, Controller, Wireless, Ethernet), Signing & Pavement Markings, Lighting (Temporary, Conductors, Pole Complete, Service Pole, Underdeck Luminaire, Pole Luminaire, Luminaire Removal, Cable Distribution), Its (Itsfm, Conduit, Pull Box, Splice Box, Junction Box Fiber Optic, Communication Cable, Cctv, Cabinet), Drainage (Inlets, Manholes and Manhole Adjustments, Pipe Culvert), Junction Box, Conduit (Embedded, Open Trench, Directional Bore, Bridge Mount), Junction Box (Embedded, Drainage), Utilities (Valve and Meter Box Adjustments), Electrical (Load Center, Power Service, Service Wire, Disconnect, Power Supply, Remote Power), Litter Removal and Mowing, and Sod Along State Road 9/i-95 at State Road 834/sample Road Interchange for 4.103 Miles in the City of Deerfield Beach and the City of Pompano Beach, Broward County. Pre-qualified: Contractor Needs to Be Pre-qualified. Performance Bond: a Contract / Performance Bond Is Required for This Project. Commercial General Liability Insurance: The Limits of Coverage Shall Not Be Less Than $1,000,000 for Each Occurrence and Not Less Than a $5,000,000 Annual General Aggregate, Inclusive of Amounts Provided by an Umbrella or Excess Policy. The Limits of Coverage Described Herein Shall Apply Fully to the Work or Operations Performed Under the Contract, and May Not Be Shared With or Diminished by Claims Unrelated to the Contract. The Policy/ies and Coverage Described Herein May Be Subject to a Deductible. Pay All Deductibles as Required by the Policy. No Policy/ies or Coverage Described Herein May Contain or Be Subject to a Retention or a Self-insured Retention. FDOT - Call Order: 001 Interchange Modification - SR-9/I-95

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Earthwork Methods, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Operation and Maintenance of Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents