Similar Projects
US 12/Walla Walla River Bridge - Bridge Painting
Infrastructure
Conception
$2,365,000 CJ est. value
Wapato, WA 98951

SR 410/1.0 miles E of Chinook Pass Summit - Culvert Lining
Infrastructure
Conception
$1,436,000 CJ est. value
Naches, WA 98937

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Early Learning Center - Heritage University
New Construction, Infrastructure
Design
$3,200,000 CJ est. value
Toppenish, WA 98948

Tieton Hydropower Project
Infrastructure
Bidding
$700,000 CJ est. value
Naches, WA 98937

Regional Beltway Connector Stage 2A
Infrastructure
Bidding
$3,000,000 CJ est. value
Union Gap, WA 98903

West Ahtanum Road Resurfacing
Infrastructure
Post-Bid
Union Gap, WA 98903

Mcclure Elementary School Safety Improvements
Infrastructure
Post-Bid
Yakima, WA 98902

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Cleman's View Park - Park and Ride
Infrastructure, Alteration
Results
$413,060 est. value
Naches, WA 98937

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

Surf Barreled
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Yakima, WA 98901

I-82 / Columbia River Bridge WB - Deck Rehabilitation
Infrastructure, Renovation
Conception
$1,480,000 CJ est. value
Sunnyside, WA 98944

SR 22 / SR 223 Chambers Rd Intersection - Intersection Safety
Infrastructure
Design
$735,000 CJ est. value
Toppenish, WA 98948

Dollar General #23747 / Harrah
New Construction, Infrastructure - 12,480 SF
Post-Bid
$2,000,000 CJ est. value
Harrah, WA 98933

Last Updated 02/08/2023 07:05 AM
Project Title

SR 823/E Naches Ave to N Wenas Rd Wye - ADA Compliance

Physical Address View project details and contacts
City, State (County) Selah, WA 98942   (Yakima County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected March 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $319,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

STIP ID 582301Y39 Pedestrian ADA curb ramps at various intersections on SR 823 in the city of Selah do not fully meet ADA standards. This project will upgrade the curb ramps to meet current standards, improving accessibility for all pedestrians. As of February 08, 2023, this project is in Final Planning status. Preliminary engineering has begun and environmental design is expected to be complete in the third quarter of 2019. The contract advertisement is expected in fourth quarter of 2026 and construction is anticipated to be operationally complete in the fourth quarter of 2027. WSDOT - SR 823/E Naches Ave to N Wenas Rd Wye - ADA Compliance *Project information has been obtained through a public state transportation improvement plan (STIP). A STIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the STIP often evolves based on funding availability. The project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents