Similar Projects
Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

Lower Frew Levee Setback Design
Infrastructure
Conception
$250,000 CJ est. value
Coles Corner, WA 98826

SR 410/0.75 miles W of East Winter Gate - Culvert Lining
Infrastructure
Conception
$450,000 CJ est. value
Enumclaw, WA 98022

Rock Island Silicon Plant Redevelopment
Demolition, New Construction, Infrastructure, Build-out
Conception
$20,000,000 CJ est. value
Rock Island, WA 98850

Highland Park Intersection Improvements - MC-TR-C100 - City of Seattle
Infrastructure
Conception
$4,100,000 CJ est. value
Seattle, WA 98106

Mount Brinyon Storm Drain Replacement-d-7-city of Kelso
Infrastructure
Conception
$350,000 CJ est. value
Kelso, WA 98626

Lads and Lassies Park Expansion-p-2-city of Kelso
Infrastructure
Conception
$250,000 CJ est. value
Kelso, WA 98626

35th Avenue Southwest Paving - MC-TR-C099 - City of Seattle
Infrastructure
Conception
$35,000,000 CJ est. value
Seattle, WA 98126

Lea Hill Safe Routes to Schools - gcbd16 - City of Auburn
Infrastructure
Conception
$950,000 CJ est. value
Auburn, WA 98002

A Street Loop - CP2117 - City of Auburn
Infrastructure
Conception
$1,192,000 CJ est. value
Auburn, WA 98001

Howard Road CCTF Expansion - City of Auburn
Infrastructure
Conception
$1,099,622 CJ est. value
Auburn, WA 98002

30th Street NE Area Flooding, Phase 3 - cpxxxx - City of Auburn
Renovation, Infrastructure
Conception
$2,244,000 CJ est. value
Auburn, WA 98002

Jacobsen Tree Farm Site Plan - cp0609 - City of Auburn
New Construction, Infrastructure
Conception
$2,500,000 CJ est. value
Auburn, WA 98092

Auburndale Park II - gpbd05 - City of Auburn
New Construction, Infrastructure
Conception
$500,000 CJ est. value
Auburn, WA 98092

Auburn Environmental Park Boardwalk - Phase 2 - cp1611 - City of Auburn
Infrastructure
Conception
$800,000 CJ est. value
Auburn, WA 98002

Last Updated 04/17/2023 12:32 PM
Project Title

I-405, NE 85th Street Interchange and Inline BRT Station Project

Physical Address View project details and contacts
City, State (County) Kirkland, WA 98033   (King County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $234,432,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

As of April 17, 2023, the general contractor Graham Construction has all the sub bids they need lined up. Construction is expected to start the end of summer of 2023. The proposed I-405, Northeast 85th Street Interchange and Inline Station Project (Project) is located within the City of Kirkland along Interstate 405 (I-405) between milepost (MP) 17.4 to MP 18.9. The Project proposes to replace the existing two-level cloverleaf interchange at NE 85th Street with a three-level interchange and construct local improvements along Northeast 85th Street and its intersection with 114th Avenue Northeast/Kirkland Way. DB Contract approximately $190 - $210 Million. Prequalification: Work Class 1 or 6 in the amount of $40 Million. Deadline for Submitting RFQ Questions March 28, 2022 Deadline for WSDOT Response to RFQ Questions April 4, 2022 Notify Short Listed Submitters May 27, 2022 ATC Submittal Deadline September 6, 2022 Deadline for Submitting Proposer questions September 6, 2022 Deadline for WSDOT Response to Proposer Questions September 13, 2022 Announce Apparent Best Value Proposer November 16, 2022 WSDOT reserves the right reject any or all of the SOQs or Proposals. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Estimated value $200,000,000 - $250,000,000

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents