Similar Projects
Construction Management Services for the Capital Improvements Program
Post-Bid
Atlanta, GA 30303

RFP Construction Assessment & Project Management Services
Post-Bid
College Park, GA 30337

Centennial and Roswell High Schools Renovations
Renovation
Results
Less than $5,099,412 est. value
Roswell, GA

Camp Creek Middle School and Paul D. West Middle School Media Center Projects
Results
Less than $1,163,826 est. value
Atlanta, GA 30349

KIPP Atlanta Collegiate High School
Renovation, Addition - 127,391 SF
Construction
$10,000,000 est. value
Atlanta, GA 30314

Grady High School Renovation and Addition
Renovation, Addition
Construction
Less than $34,900,000 est. value
Atlanta, GA 30309

Hopewell Middle School and Holcomb Bridge Middle School Media Center Projects
Results
Less than $1,304,456 est. value
Milton, GA 30004

Riverwood High School - Phase 3 Auditorium Gymnasium Addition
Addition
Construction
Less than $30,769,900 est. value
Sandy Springs, GA 30328

Grady High School Additions and Renovations
Renovation, Addition
Results
Less than $34,000,000 est. value
Atlanta, GA 30309

Roswell High School Renovation and Additions
Renovation, Addition
Construction
Less than $8,625,000 est. value
Roswell, GA 30075

Construction of New South STEM School
New Construction - 147,000 SF
Results
Less than $37,806,905 est. value
Fairburn, GA 30213

CMAR for Susan Todd Pearson Middle School
Results
Kennesaw, GA 30303

Centennial High School Renovation and Additions
Renovation, Addition
Results
Less than $8,993,000 est. value
Roswell, GA 30076

Amana Academy Charter School
Results
Alpharetta, GA 30009

Construction-Management-At-Risk services for the Construction of a Junior Achievement Building (JA) Interiors Fit-up
Results
Atlanta, GA 30314

Reported 04/21/2021 12:00 AM
Project Title

Construction Time And Materials, And Miscellaneous

Physical Address View project details and contacts
City, State (County) College Park, GA   (Fulton County)
Category(s) Education
Sub-Category(s) Middle/Senior High School
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs)
Bids Due View project details and contacts
Estimated Value
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

FCS isseeking proposals from qualified contractorsfor renovations or small construction projects on a time and materials basis for use at building sites throughout the District. Typical projects are to be under $100,000.00 per project.

Details

Middle/Senior High School, Renovation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Steel Joist Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Specialty Doors and Frames, Entrances and Storefronts, Windows, Mirrors, Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Acoustical Ceilings, Flooring, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet Compartments, Shower and Dressing Compartments, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Service Line Equipment, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Library Equipment, Audio-Visual Equipment, Laboratory Equipment, Athletic and Recreational Equipment.
Division 12 - Furnishings, Window Treatments, Casework, Furniture, Multiple Seating.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Facility Storm Drainage, Plumbing Equipment, Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Excavation and Fill, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Athletic and Recreational Surfacing, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents