Similar Projects
Access Control Point Program Design Build II -- RFI(2)
Design

Indefinite Delivery / Indefinite Quantity (IDIQ) Global Contingency Construction (GCC) Multiple Award Contract (MAC)
Design
Less than $5,000,000,000 est. value

USPS IQ JOC - Alabama
Renovation
Bidding
$10,000 to $10,000,000 est. value

Defense Health Agency - Medical Facility Operations and Maintenance
Bidding
$2,500 to $90,000,000 est. value

Two-Phase South Region Unrestricted MATOC, Mobile District AOR
Post-Bid
$100,000,000 to $250,000,000 est. value

Sources Sought Synopsis for United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Post-Bid
$3,000,000 to $15,000,000,000 est. value

Army Mechanical MATOC
Results
Less than $2,000,000 est. value

Air Force Contract Augmentation Program (AFCAP) V
Results

SB Fuels Multiple Award Task Order Contract (MATOC)
Design
Less than $349,000,000 est. value
Washington, DC

D/B Southeast MATOC - Phase 2
Post-Bid
$1,000,000 to $170,000,000 est. value

Civil Construction Multiple Award Indefinite-Delivery Indefinite-Quantity (IDIQ) Contracts
Design
$250,000 to $5,000,000 est. value

Construction Services Performed on AJW-242 Unstaffed Infrastructure Sustainment (UIS) Facilities On and Off Airport Operating Areas
Post-Bid
Less than $150,000,000 est. value

Rapid Disaster Infrastructure (RDI) #2
Design
Less than $99,000,000 est. value

USPFO-AL Construction Multiple Award Task Order Contract (MATOC)
Post-Bid
$2,000 to $6,000,000 est. value

Region 4 Single Award IDIQ Job Order Construction Contracts (JOCC) for Construction Services In States of AL, FL, GA, KY, MS, NC, SC, & TN
New Construction, Renovation
Design
$2,000 to $5,000,000 est. value

Last Updated 01/30/2020 03:57 PM
Project Title

CDP Facility Operations and Support Services

Physical Address View project details and contacts
City, State (County) Anniston, AL   (Calhoun County)
Category(s) Government/Public
Sub-Category(s) Misc. Buildings
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Set Aside for HUBZone. The primary functions to be performed are the operation, maintenance, repair, and minor alteration of the physical facilities, janitorial, housekeeping and lodging (billeting) support services and mail center operations for the CDP. The contractor shall provide the required project management, administrative services, associated scheduled (e.g., preventive/predictive) maintenance, unscheduled work (service orders), refuse disposal, hazardous waste management, recycling, and other services described herein. In performing these functions the contractor shall provide all parts, labor, supervision and administration, tools, equipment, vehicles, fuels, vehicle and equipment maintenance required, unless specifically identified in Section 3 as Government furnished. Physical facilities include, but are not limited to the following: a. Electrical systems and equipment b. Mechanical, plumbing, Building Automation System (BAS) where applicable (where BAS/ ECMS systems are connected to the CDP network, the contractor's employees shall obtain a CDP account to access systems) and heating, ventilation, and air conditioning (HVAC) systems and equipment c. Fire protection and life safety systems d. All control systems that are within the scope of this Contract. All Building Automation Systems (BAS), Public Address Systems, and Lighting Systems that are within the scope of this Contract e. Architectural and structural systems, fixtures, and equipment within the site f. Service request desk operations as identified in the PWS, to include record keeping using a computerized maintenance management system (CMMS) g. Maintenance of grounds irrigation systems h. Tools and maintenance equipment (including testing equipment) i. Vehicle barrier systems and static and dynamic bollard systems j. All doors and windows k. Autoclave system l. Storm drainage systems - reduce storm water pollution by minimizing discharges and runoff to the storm sewer system and environment m. Facility roofing systems n. The U.S. flag pole, lighting and pulley system(s) o. All site drainage systems p. Lightning protection system q. Updates of software/firmware to latest revision and update software licenses for BAS r. Water storage system and treatment (including water tower) s. Contaminated waste disposal, to include hazardous waste t. Compressed gases u. Air filtration system (filter banks) v. Safety operations w. Package Boilers x. Civil features y. Security systems (excluding C-cure) z. Closed Circuit Television Systems and Monitors (COBRATF) aa. Calibration standards and equipment systems The performance work statement is intended to be performance oriented. However, due to the hazards that could be encountered in preparation for and during the conduct of chemical and biological agent training, some tasks are specific and must be executed exactly as required in applicable procedures. Any proposing offeror is invited and encouraged to provide a technical solution which identifies a more performance oriented approach.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Acoustical Ceilings, Flooring, Carpeting, Acoustic Treatment, Painting.
Division 12 - Furnishings.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.
Division 26 - Electrical, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents