Similar Projects
Upper Brays Bayou Greenway (BR 26) - Braeburn Glen Boulevard to Eldridge Parkway
Post-Bid
$11,100,000 to $12,500,000 est. value
Houston, TX 77074

Deer Park Hike and Bike Trails - Phase 1
Post-Bid
$400,000 est. value
Deer Park, TX

Water, Sanitary Sewer, and Drainage Facilities for wayside Village Section 6 and Parker Road
Results
Houston, TX

Intramural Gravel Lot Conversion
Results
Houston, TX 77204

O'Reilly Auto Parts (CP3) / Cypress
New Construction, Infrastructure - 7,200 SF
Construction
$1,300,000 CJ est. value
Cypress, TX 77429

East River Phase I
New Construction - 649,156 SF
Construction
Houston, TX 77020

Eagle's Trace RB 3.2
New Construction, Infrastructure
Pending Verification
$30,000,000 CJ est. value
Houston, TX 77077

Katy ISD Schmalz Elementary School Addition and Renovation
Addition, Demolition, Renovation, Infrastructure - 20,532 SF
Pending Verification
$7,133,736 CJ est. value
Houston, TX 77084

Clay Road Reconstruction
Post-Bid
$2,600,000 est. value
Houston, TX 77282

Silver Springs West Richey Road Dedication, Section One
Results
Less than $1,009,711 est. value
Houston, TX 77040

Richmond Senior Village
New Construction, Infrastructure - 171,000 SF
Construction
$18,000,000 CJ est. value
Houston, TX 77057

(H69) 22053 / O'Reilly Auto Parts
New Construction, Infrastructure - 7,453 SF
Pending Verification
$1,000,000 CJ est. value
Houston, TX 77032

RFQ - United States Coast Guard (USCG) Disaster Reconstitution Multiple Award Construction Contract
Term Contract
Post-Bid
$1,500,000 CJ est. value
Seattle, WA 98174

FM 1960 - Intersection Improvements
Results
Less than $13,274,738 est. value
TX

Almeda & Orem RV Resort
New Construction - 4,448 SF
Construction
$3,700,000 est. value
Houston, TX 77045

Last Updated 10/24/2022 01:36 PM
Project Title

Shepherd and Durham Reconstruction - 15th Street to IH 10 - N-100041

Physical Address View project details and contacts
City, State (County) Houston, TX 77007   (Harris County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected May 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $55,000,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Project provides for the design and reconstruction of this eight-lane one-way pair corridor as a six-lane (three lanes each on Shepherd and Durham), divided, concrete roadway with pedestrian and bicycle facilities, traffic control and necessary underground utilities. As of October 24, 2022, a design engineer has been selected. No firm timeline has been established for the construction.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents