Similar Projects
Roadway and Miscellaneous Repairs
Infrastructure
Bidding

Bituminous Leveling and Overlay
Post-Bid
Landenberg, PA

2021 Road Projects
Infrastructure
Post-Bid
Landenberg, PA

Great Valley Middle School Site Paving & Wall Restoration Phase 2
Results
$950,000 est. value
Malvern, PA 19355

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Roadway and Bridge Reconstruction
Infrastructure
Post-Bid

Asphalt Paving
Results
Downingtown, PA 19335

Resurfacing Roadway
Infrastructure
Post-Bid
Kennett Square, PA

Pave-In-Place Paving on Various Roadways
Results
$551,000 est. value
Downingtown, PA 19335

Woodhaven Road
Infrastructure
Post-Bid
Kemblesville, PA

Chip Seal of Township Roads
Results
Chester Springs, PA 19425

Newark Road Old Baltimore Pike
Infrastructure
Post-Bid
Toughkenamon, PA 19374

General Construction - Full Service Hook-up, Campsites Loop A
Results
$500,000 to $1,000,000 est. value
Elverson, PA 19520

2022 Township Interim Road and Maintenance Services
Infrastructure
Post-Bid
Kemblesville, PA

Sealcoating and Pavement Repairs
Results
West Chester, PA 19382

Last Updated 12/27/2021 11:27 AM
Project Title

Whitford Road Widening

Physical Address View project details and contacts
City, State (County) Exton, PA 19341   (Chester County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $90,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The work primarily consists of widening 250 feet of Whitford Road at the intersection with Waterloo Boulevard. The work will also include installation of drainage structures and curbing. The contractor will be required to coordinate his work with the site contractor who is presently working at 375 Lincoln Highway (Primrose Daycare) who will also be widening a section of Whitford Road from Lincoln Highway to the southern project limit. Ultimately, the Township’s overall goal is to construct an additional northbound lane on Whitford Road between Lincoln Highway and Waterloo Boulevard. This project is not subject to prevailing wages.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents