Similar Projects
It'Sugar
Build-Out - 22,000 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami Lakes, FL

Target Art Deco Apartment Tower
New Construction, Build-Out - 30,089 SF
Conception
$1,000,000 to $5,000,000 CJ est. value
Miami Beach, FL

Eastside Ridge
New Construction - 5,420,829 SF
Design
$10,000,000 CJ est. value
Miami, FL

Eastside Ridge
New Construction - 5,420,829 SF
Design
$10,000,000 CJ est. value
Miami, FL

Lids
Renovation
Bidding by Invitation
Miami, FL 33172

Sycomp
Renovation - 894 SF
Post-Bid
$53,000 est. value
Coral Gables, FL 33134

Independent Living Systems
New Construction, Renovation - 2,291 SF
Post-Bid
Doral, FL 33166

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

The Plaza Coral Gables
New Construction - 2,120,000 SF
Construction
$100,000,000 est. value
Coral Gables, FL 33134

Smart Brickell - Tower III
New Construction, Build-Out - 30,000 SF
Conception
Miami, FL

27 Edgewater
New Construction, Build-Out - 198,572 SF
Design
$35,000,000 est. value
Miami, FL 33137

Walmart Supercenter #2091-258 - OGP
Renovation - 850 SF
Post-Bid
Doral, FL 33126

River Landing Shops and Residences
New Construction - 1,600,000 SF
Construction
$425,000,000 est. value
Hialeah, Miami, FL 33010

Biscayne Boulevard Mixed-Use Development
New Construction
Conception
Miami, FL

100 Miracle Mile
New Construction, Renovation - 102,045 SF
Design
$10,000,000 CJ est. value
Coral Gables, FL

Last Updated 02/04/2021 12:00 AM
Project Title

Palmer Lakes Logistics Center

Physical Address View project details and contacts
City, State (County) Miami, FL 33142   (Miami-Dade County)
Category(s) Commercial, Industrial/Manufacturing
Sub-Category(s) Industrial Warehouse, Office, Retail
Contracting Method Qualified Bidding.
Project Status Conceptual Design, Seeking Zoning Variances
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, Build-Out, Office, Build-Out, Industrial Warehouse, Approximately 603,418 SF New Construction, 9 Acres.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Windows.
Division 09 - Finishes.
Division 10 - Specialties, Signage, Fire Protection Specialties.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Flood Lighting.
Division 27 - Communications.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Pavement Markings, Fences and Gates, Screening Devices.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents