Similar Projects
Waterworks and Sewerage Supplies
Bidding
Manchester, CT

Adjusting Manhole Frames and Valve Covers
Post-Bid
Waterford, CT

Acceptance and Disposal of Catch Basin Grit
Post-Bid
South Windsor, CT

Grease Interceptor Removal / New Installation
Results
Enfield, CT

Sanitary Sewer Manhole and Pipe Replacement
Results
South Windsor, CT

Furnishing Water Hydrants
Post-Bid
Hartford, CT

Water Main Extension Babbs Road and Service Connection to Babbs Beach
Results
$125,220 est. value
Suffield, CT

Septic System Replacement
Post-Bid
Less than $75,000 est. value
Manchester, CT 06040

Supply and Return Line Repair at Eisenhower Park Pool
Results
West Hartford, CT 06107

Laning Street Pressure Reducing Valve Project
Post-Bid
Southington, CT 06489

Cargo Building Sewer Line Replacement
Results
Windsor Locks, CT 06096

Annual Catch Basin Cleaning Services
Term Contract
Post-Bid
Berlin, CT

Sewer Repair and Related Construction Services
Results
Hartford, CT

Catch Basin Cleaning Services
Term Contract
Results
Hartford, CT 06106

Furnish Cast Iron Materials and Catch Basin Components
Results
Hartford, CT 06103

Last Updated 03/31/2020 09:58 AM
Project Title

Oakwood Avenue Phase 1 Water and Sewer Improvements Project

Physical Address View project details and contacts
City, State (County) Hartford, CT 06103   (Hartford County)
Category(s) Sewer and Water
Sub-Category(s) Sanitary Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for 4,130 linear feet of sewer main replacement, 5,750 linear feet of sanitary sewer main clean, CCTV, and CIPP lining, 3,550 linear feet of sanitary sewer lateral removal and replacement (including sanitary sewer chimneys), the removal and replacement of 13 sanitary sewer manholes, the removal and replacement of 33 sanitary sewer frames and covers, the installation of 3,290 linear feet of water main, water main accessories and the renewal of 1,760 LF of water services. The project also includes the temporary and permanent restoration of the existing roadway, lawn area, sidewalk, curbing and driveway aprons, along with support equipment and accessories as shown and specified. The Work shall consist of all labor, equipment, fees, permits, and other related costs necessary to provide for 8,230 linear feet of sanitary sewer main cleaning, CCTV, and CIPP lining, 1,250 linear feet of sanitary sewer lateral removal and replacement (including sanitary sewer chimneys), the removal and replacement of 45 sanitary sewer frames and covers, the installation of 2,820 linear feet of water main, water main accessories and the renewal of 68 water services. The project also includes the temporary and permanent restoration of the existing roadway, lawn area, sidewalk, curbing and driveway aprons, along with support equipment and accessories as shown and specified.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Sanitary Sewerage Utilities, Sanitary Utility Sewerage Piping, Sanitary Utility Sewerage Force Mains, Sanitary Utility Sewerage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents