Similar Projects
Rock Quarry Landing
New Construction
Conception
Raleigh, NC

Wendell Place Apartments
New Construction
Conception
Wendell, NC

3402 Hillsborough
New Construction - 71,000 SF
Design
Raleigh, NC 27607

Hampton Spring
New Construction
Design
Raleigh, NC

Greek Village Phase 4
Post-Bid
Less than $6,735,000 est. value
Raleigh, NC 27695

The Sussex
New Construction
Post-Bid
Raleigh, NC

Beacon Ridge
New Construction - 80,144 SF
Construction
Raleigh, NC 27610

Peace
New Construction - 61,000 SF
Construction
$150,000,000 est. value
Raleigh, NC

Apartment Complex
New Construction
Conception
Cary, NC

Park City South Housing
New Construction - 867,000 SF
Design
$10,000,000 CJ est. value
Raleigh, NC

Abbington Square
New Construction - 103,863 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Raleigh, NC

Amber Spring
New Construction - 52,267 SF
Construction
$4,668,560 est. value
Raleigh, NC 27616

The Cottages at Knight's Landing
New Construction
Conception
Knightdale, NC

Booker Park South
New Construction
Design
Raleigh, NC

Disposition of County-Owned Land at 1317 N Main Street
Post-Bid
Holly Springs, NC 27602

Last Updated 01/23/2020 01:03 PM
Project Title

Cardinal at North HIlls Tower

Physical Address View project details and contacts
City, State (County) Raleigh, NC 27609   (Wake County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums
Contracting Method Qualified Bidding.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Apartments/Condominiums, 15 Stories Above Grade, New Construction 160 Unit(s).
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents