Similar Projects
Russell Campus, Building & Fire Prevention Chiller Replacement
Renovation
Sub-Bidding
$1,777,000 CJ est. value
Las Vegas, NV 89118

Boiler Maintenance Services
Term Contract
Sub-Bidding
Las Vegas, NV 89101

Terminal Unit Replacement
Alteration
Post-Bid
$725,000 est. value
Las Vegas, NV 89147

HVAC Service and Repair
Alteration
Post-Bid
Las Vegas, NV 89146

Satellite Energy Plant (SEP) Cooling Tower Repair
Results
$350,000 est. value
Las Vegas, NV 89154

HVAC and Electrical System Upgrade Edward A. Greer Education Center
Alteration
Results
$520,000 est. value
NV

HVAC Filter Service
Alteration
Post-Bid
Las Vegas, NV

F--Air Duct Cleaning BPA
Term Contract
Results
Boulder, CO - Las Vegas, NV

High Desert State Prison (HDSP) Air Handler Media Replacement
Alteration
Post-Bid
$3,000,000 est. value
Indian Springs, NV 89070

City Wide Air Filter Replacement
Term Contract
Results
Las Vegas, North Las Vegas, NV 89030

Autoclave Sterilizer and Boiler Project
Renovation
Post-Bid
$1,500,000 CJ est. value
Las Vegas, NV 89102

Building 4 HVAC Systems Renovation
Alteration
Results
$150,000 est. value
Carson City, Las Vegas, NV 89701

North Las Vegas Air Handler 12 Replacement
Alteration
Post-Bid
$385,000 est. value
North Las Vegas, NV 89030

CBC (Classroom Building Complex) Cooling Towers Repairs
Alteration
Results
$108,000 est. value
Las Vegas, NV 89154

WHI Boiler Installation
Renovation
Post-Bid
$160,000 CJ est. value
Las Vegas, NV 89154

Last Updated 06/26/2023 07:18 PM
Project Title

Government Center - Hydronic Piping, Chiller and Water Pump Replacement

Physical Address View project details and contacts
City, State (County) Las Vegas, NV 89155   (Clark County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Contract Award, Construction start expected August 2023
Bids Due View project details and contacts
Estimated Value $450,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

ESTIMATED COST: $6,076,200.00 - $6,396,000.00. This project consists of the Government Central Plant's replacement of existing hydronic piping system chillers and pumps. 1. Remove and replace existing hydronic piping including the underground hydronic piping between central plant and the Government Center and RTC building. 2. Provide a temporary system to maintain cooling and heating operations until system is successfully operational and can be turned over to Government Center and RTC buildings. Refer to sheet M0.6 for capacity. a. Include self-contained temporary air- cooled chiller with required pumps and appurtenances to maintain operating systems during replacement. Pumps shall be connected to building DP sensor to adjust VFD. 3. Chiller Replacement a. Remove and replace three (3) 500-ton chillers. b. Remove and replace all isolation valves of condenser and chilled water loops for each chiller. c. Remove and replace actuated valve and actuators on condenser and chilled water loops. d. Modify existing chilled water pipes for new chiller configuration. 4. Chilled Water Pump Replacement a. Remove and replace (3) chilled water pumps with bell and gossett pumps. b. Remove and replace chilled water pump variable frequency drives (VFD's). c. Remove and replace all isolation valves, flow control/check valves and install temperature gauges at each chiller on condenser and chilled water loops. 5. Condenser Water Pump Replacement a. Three (3) 500-ton cooling towers and one (1) 650-ton cooling tower to remain. Existing VFD's for each shall be removed and replaced. b. Remove and replace all existing condenser water piping, isolation valves, three (3) condenser water pumps, common header piping, and associated branch piping and all pressure and temperature devices. Four (4) existing sand separators to remain. c. Remove and replace existing VFD's for existing pumps 'VP-01,' 'VP-02,' and 'VP-03.' 6. Abandon in place all unused existing site hydronic piping and backfill with lightweight concrete slurry. 7. Remove and replace existing refrigerant monitoring system with new. 8. Provide associated electrical and mechanical demolition and modifications for new equipment as shown in drawings. 9. Structural: Government Center Parking Lot canopy shall be structurally modified based on new routing of hydronic piping. Chiller pads to be extended to accommodate size of new chillers. 10. Provide power from existing main switchboard to temporary portable air-cooled chiller. 11. Provide interface with associated BMS controls. 12. Provide test and balance services and report and a part of commissioning. 13. Modify existing water treatment system for new equipment configuration. Contractor work in phases to accommodate Owner's occupancy requirements during the construction period, Coordinate construction schedule and operations with Owner. Question Cuttoff Date & Time 6/5/2023 08:00:00 PM (ET)

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents