Similar Projects
FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

FAA Airport Traffic Control Tower Design Competition
New Construction
Bidding

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

Water System Zone Intertie Design Preparation
Infrastructure
Post-Bid

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

A-E Shortlist for USDA-FS, Region 8 and 10, SRS-PNW-LITF Research Stations 2021
New Construction
Results

$98M AE IDCs for Fuel Design and Inspection Services, Worldwide
Renovation, Term Contract
Bidding
Less than $98,000,000 est. value

Electrical Engineering Services
Infrastructure
Post-Bid

Engineering Services for North Sound to Olympics (STO) Trail Planning Study
Infrastructure
Results
Less than $343,000 est. value

Public Works Energy A-E Services - Worldwide
Renovation
Bidding
$40,000 to $3,000,000 est. value

Architect-Engineer - Air Field Pavement Design MATOC
New Construction, Term Contract
Post-Bid

Rfq Multiple Engineering Service
Term Contract
Post-Bid

Unr AE Afp Design MATOC
New Construction, Term Contract
Post-Bid
Less than $30,000,000 est. value

Request for Qualifications (Architectural and Engineering Services)
Term Contract
Post-Bid

Regional A-E Environmental Services
Renovation, Term Contract
Post-Bid

Last Updated 12/28/2021 09:47 AM
Project Title

Manson Bay Marina Breakwater Replacement Planning

Physical Address View project details and contacts
City, State (County) Manson, WA   (Chelan County)
Category(s) Professional Services
Sub-Category(s) Architectural, Engineering
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The consultant to complete a planning and design effort for the near-term replacement of its existing breakwater at Manson Bay Marina. Anticipated scope of work includes, but is not necessarily limited to a facility assessment; development of 95%-level plans, specifications and estimates (PS&E); and permitting for the renovation of the deteriorating breakwater. Additional work may include a high-level feasibility analysis for expansion to accommodate potential increase in marina slip capacity. Deliverables of critical elements must be compatible with Washington State RCO Boating Facilities Planning Grant Requirements.

Details

Architectural, New Construction.