Similar Projects
Buckhead Tower Ritz-Carlton and Condos
New Construction
Conception
Atlanta, GA 30326

Summerhill Hotel Redevelopment
Renovation - 206,000 SF
Conception
Atlanta, GA 30312

Signia Hilton Atlanta
New Construction - 911,400 SF
Design
$220,000,000 est. value
Atlanta, GA 30313

Dream Atlanta Buckhead
New Construction
Design
Atlanta, GA

LMIG Street Resurfacing 2020
Infrastructure
Bidding
College Park, GA

Residence Inn by Marriott
New Construction - 200,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Atlanta, GA 30313

Residence Inn by Marriott
New Construction - 200,000 SF
Post-Bid
$5,000,000 to $10,000,000 CJ est. value
Atlanta, GA 30313

General Contractor Services - 175 Piedmont North Parking Deck Repairs
Results
Less than $270,000 est. value
Atlanta, GA 30302

Domestic Terminal Parking Decks Renewal
Infrastructure
Results
Atlanta, GA 30320

Towne Place Suites Marriott
New Construction - 61,200 SF
Construction
$5,000,000 to $10,000,000 CJ est. value
Hapeville, GA 30354

The Indie
New Construction - 246,195 SF
Construction
$10,000,000 CJ est. value
Atlanta, GA 30312

North Avenue MARTA Station Transit-Oriented Development
New Construction - 480,000 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30308

North Avenue MARTA Station Transit-Oriented Development
New Construction - 480,000 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30308

1104 Avondale Avenue Southeast
New Construction - 230,000 SF
Conception
$10,000,000 CJ est. value
Atlanta, GA 30312

Moontower - Student Housing Tower
New Construction
Design
$1,732,000 est. value
Atlanta, GA 30308

Reported 10/25/2021 03:53 PM
Project Title

Residence Inn fka Element Hotel

Physical Address View project details and contacts
City, State (County) Roswell, GA 30076   (Fulton County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Parking Garage
Contracting Method General Contractor to Subcontract.
Project Status Project Delayed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

92,596 SF - 1 Hotel/Motel, 5 Stories Above Grade, 83,224 SF New Construction 102 Unit(s), 1 Parking Garage, 2 Stories Above Grade, 17,556 SF New Construction 50 Parking Spaces.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 13 - Special Construction, Swimming Pools.
Division 14 - Conveying Equipment, Elevators.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents