Similar Projects
Smithville Road Culvert Replacement - BR-2017-009H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Mapleton, IL 61547

Cottonwood Road Culvert Replacement - BR-2020-002H - County of Peoria
Infrastructure
Conception
$300,000 CJ est. value
Logan Township, IL 61536

New Restroom and Site Work W. H. Sommer Park
New Construction, Infrastructure
Design
$251,000 CJ est. value
Edwards, IL 61528

Maxwell Road Bridge - BR-2017-014H - County of Peoria
Infrastructure, Renovation
Design
$2,943,132 CJ est. value
Peoria, IL 61607

North Road Patching Phase 1 - Detweiller Park
Infrastructure
Bidding
$200,000 CJ est. value
Peoria, IL 61615

North Road Patching Phase 1 - Detweiller Park
Infrastructure
Bidding
$200,000 CJ est. value
Peoria, IL 61615

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Pavement Patching
Infrastructure
Post-Bid
$300,000 CJ est. value
Lockport, IL 60441

Princeville Jr/Sr High School Pavement Reconstruction
Infrastructure
Results
Princeville, IL

N. Villa Lake Drive and W. Wildlife Drive Street Reconstruction
Infrastructure
Results
Peoria, IL 61614

Reservoir Boulevard Solar Utility Facility
New Construction, Infrastructure
Pending Verification
$1,000,000 CJ est. value
Peoria, IL 61615

Blue Ridge Road Bridge Slopewall Replacement - BR-2021-001H - Peoria County
Demolition, New Construction, Infrastructure
Conception
$310,000 CJ est. value
Medina Township, IL 61523

Glen Avenue Culvert Replacement
Infrastructure
Design
$90,000 CJ est. value
Peoria, IL 61614

Construction of the 2022 Non-MFT Seal Coat
Infrastructure
Post-Bid
$147,000 est. value
Bellevue, IL

Buckthorn Way Reconstruction
Infrastructure
Results
Peoria, IL 61640

Last Updated 08/12/2023 02:05 AM
Project Title

Pavement Widening for Wb Left-turn Lane, Resurfacing, and Drainage Improvements at the Intersection of IL 116

Physical Address View project details and contacts
City, State (County) Peoria, IL 61604   (Peoria County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development, Water Lines
Contracting Method Bids by Invitation, Competitive Bids
Project Status Contract Award, Request for Qualifications, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $1,488,251 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

Pavement widening for WB left-turn lane, resurfacing, and drainage improvements at the intersection of IL 116 and Cameron Lane in Peoria County. Region 3 District 4 Federal Project # HSIPCW5U(969) Section (11R)W-2 County(S) Peoria Key Route(S) FAP 669 Marked Route(S) IL 116 Section(S) (11R)W-2 State Job #(S) C-94-049-22 Pps #(S) C-94-049-22 40 Working Days Questions not accepted as of June 06, 2023 04:30 PM. Questions directed to: IDOT Contracts Office Harry R. Hanley Building Room 326 2300 South Dirksen Parkway Springfield, IL 62764 (217) 782-7806 Fax: (217) 785-1141 TDD: (217) 524-4875 DOT.DE-Contracts@illinois.gov Unless otherwise indicated, a proposal guaranty is required by bid bonds, cashier's check or properly certified check for not less than 5 (five) percent of the bid amount. If the proposal is accepted and the bidder is declared "not responsive," it is hereby agreed that the amount of the proposal guaranty will become the property of the State of Illinois and shall be considered as payment of damages due to the delay and other causes suffered by the State because of the failure to adhere to the procedures required. Otherwise, the bid bond will become void or the proposal guaranty check will be returned to the bidder. Contractors who desire to become prequalified or to renew their prequalification for this letting must file with the Department of Transportation, Bureau of Construction, Room 322, 2300 South Dirksen Parkway, Springfield, Illinois 62764, a Contractor's Statement of Experience and Financial Condition no later than 4:30 PM prevailing local time, April 07, 2023. A contractor will not be prequalified for this letting unless the statement is received before the time and day established. The Department reserves the right to reject any and all bids, to waive minor or immaterial irregularities, informalities or technicalities, to advertise for new bids, or to request confirmation or clarification from any bidder regarding a bid. ILDOT - 174 - Pavement Widening for Wb Left-turn Lane, Resurfacing, and Drainage Improvements at the Intersection of Il 116 DBE (5%) The Contractor shall complete the work within 40 working days.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents