Similar Projects
New Jail Construction
New Construction
Conception
$32,000,000 est. value
Ironton, OH

Regional Jail Expansion
Addition
Conception
OH

Mansfield & Richland Correctional Institution Renovations
Renovation
Design
$11,430,000 est. value
Mansfield, OH

Juvenile Probation Office Renovation - Contract #1, Contract #2, Contract #3
Renovation - 32,423 SF
Bidding
$121,710 est. value
Cambridge, OH 43725

Wood County Jail Expansion and Renovation for Detention Equipment and Secured Electronics
Renovation
Post-Bid
$19,806,750 est. value
Bowling Green, OH 43402

Fayette County Adult Detention Facility
Results
Less than $2,061,945 est. value
Washington CH, OH

Lakewood Police Department Jail Improvements
Results
$283,000 est. value
Lakewood, OH

Scioto County Jail Expansion
Addition
Pending Verification
Portsmouth, OH 45662

Southeastern Ohio Regional Jail
Addition
Pending Verification
Nelsonville, OH

New Jail
New Construction
Conception
$50,000,000 est. value
OH

Ashland County Jail Medical Isolation Cell
Results
Less than $121,100 est. value
Ashland, OH

CBCF Training Facility Ohio Department of Rehabilitation and Correction
Renovation
Results
$725,000 est. value
Toledo, OH 43608

OPI Glove Manufacturing Facility
New Construction
Results
$3,000,000 est. value
London, OH 43140

Jail Expansion/Renovation
Renovation
Results
$19,806,750 to $21,342,000 est. value
OH

Crosswaeh Community Based Correctional Facility Interior Renovations
Renovation
Results
$165,000 est. value
Tiffin, OH 44883

Reported 06/29/2022 03:27 PM
Project Title

Harrison County Jail

Physical Address View project details and contacts
City, State (County) Cadiz, OH   (Harrison County)
Category(s) Government/Public
Sub-Category(s) Prison/Jail
Contracting Method Competitive Bids.
Project Status Construction Documents, Construction Start Expected October 2022
Bids Due View project details and contacts
Estimated Value $15,000,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

New construction of a detention facility in Cadiz, Ohio. Working plans call for the construction of a 60-bed detention facility. This project will be a 60 bed jail including cafeteria, cells, inmate intake/outtake area, jail, offices, processing, restroom, shipping/receiving, shower, vehicle parking, visiting area, and waiting. As of June 28, 2022, design is underway. Construction could begin September or October 2022 but a schedule for bidding has not been set.

Details

Prison/Jail, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications, Metal Specialties, Detention Enclosures.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Access Doors and Panels, Special Function Doors, Security Doors and Frames, Security Gates, Detention Doors and Frames, Windows, Special Function Windows, Detention Windows, Detention Window Screens, Hardware, Glazing.
Division 09 - Finishes, Flooring, Painting and Coating, Special Coatings, Concrete and Masonry Coatings.
Division 10 - Specialties, Signage, Lockers, Flagpoles, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Detention Equipment, Detention Pass-Through Doors, Detention Gun Lockers, Foodservice Equipment.
Division 12 - Furnishings, Detention Furniture.
Division 13 - Special Construction, Special Purpose Rooms.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Special Purpose Lighting, Detention Lighting, Exterior Lighting.
Division 27 - Communications, Data Communications, Voice Communications, Audio-Video Communications, Audio-Video Systems, Electronic Digital Systems, Public Information Systems, Distributed Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Earth Moving, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Planting, Turf and Grasses.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents