Similar Projects
Milwaukie / El Puente Elementary Safe Routes to School Improvements - City of Milwaukie
Infrastructure
Conception
$5,196,000 est. value
Milwaukie, OR

I-205 Widening and Abernethy Bridge Seismic Upgrades Phase 1 and 2
Infrastructure
Conception
$500,000,000 CJ est. value
Oregon City, OR 97045

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

OR 43: Arbor Dr - Hidden Springs Rd
Infrastructure
Design
$3,935,000 CJ est. value
West Linn, OR 97068

I-205 Improvements 1A - Or43 To Or213 Section of the East Portland Freeway
Infrastructure
Post-Bid
$30,000,000 est. value
OR

RFP D/B - Tri-City Water Resource Recovery Facility (WRRF) Outfall Project
Infrastructure
Post-Bid
$44,400,000 CJ est. value
Oregon City, OR 97045

Webster Area Paving Project
Infrastructure
Results
$775,000 est. value
Oregon City, OR

Fuller-Causey Crosswalk Improvements Project
Infrastructure
Results
$150,000 to $200,000 est. value
Oregon City, OR

Mount Tabor Yard Maintenance Facility and Multimodal Pathway Project
New Construction
Construction
$13,500,000 est. value
Portland, OR

Public Works Operations Complex
New Construction, Infrastructure, Renovation
Construction
$19,000,000 CJ est. value
Wilsonville, OR 97070

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

Deer Valley Residential Care Facility
New Construction, Infrastructure - 26,508 SF
Pending Verification
$6,000,000 CJ est. value
Happy Valley, OR 97086

OR 224 at SE Monroe St
Infrastructure
Design
$3,077,537 CJ est. value
Estacada, OR 97023

Salmonberry Drive Paving Project
Infrastructure
Post-Bid
$200,000 est. value
Oregon City, OR 97045

US26: SE Kelso Rd - Frog Lake Sno Park Section of the Mt Hood and Warm Springs Highway (Rt. No. US26) beginning in Sandy
Infrastructure
Results
$500,000 to $1,000,000 est. value
Sandy, OR

Last Updated 07/26/2023 02:53 PM
Project Title

Washington Street Area Improvements

Physical Address View project details and contacts
City, State (County) Milwaukie, OR 97222   (Clackamas County)
Category(s) Heavy and Highway, Sewer and Water
Sub-Category(s) Maintenance, Paving/Reconstruction, Sidewalks/Parking Lot, Site Development, Water Lines
Contracting Method Competitive Bids
Project Status Bidding, Request for Qualifications, Construction start expected September 2023
Bids Due View project details and contacts
Estimated Value $9,100,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

The estimated cost range for this project is $7,800,000 to $9,100,000. The Project generally consists of the following (the Work): Install approximately 2,300 lineal feet of storm and sanitary pipe, 12-inch diameter and smaller, by trenching Install approximately 2,400 lineal feet of storm drainage pipe, 24-inch diameter, by trenching Install approximately 48 storm inlets and 30 manholes Replace existing 24-inch storm drainage culvert with 36-inch culvert where Spring Creek crosses SE Washington St, by trenching Rehabilitate approximately 2,450 lineal feet of sanitary sewer pipe, 12-inch diameter and smaller, by pipe bursting Install approximately 1,500 lineal feet of 6-inch and 8-inch water pipe, by trenching Install approximately 16 existing water services Install Pressure Reducing Valve (PRV) assembly and vault Rehabilitate approximately 19,150 square yards of asphalt concrete pavement (ACP) by 3-inch grind and inlay Reconstruct approximately 1,300 square yards of ACP in SE Edison St Install approximately 5,200 lineal feet of concrete curb Install approximately 48,650 square feet of concrete walks and driveways Install approximately 47 new curb ramps at existing pedestrian crossings Perform additional and Incidental Work as required by the specifications and construction plans

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents