Similar Projects
Barton, Argo, and Superior Gate Repair
Bidding
Ann Arbor, MI

Ypsilanti Community Schools Energy Performance Contract
Post-Bid
Ypsilanti, MI

Land Improvement Building Number 1009965 HV Electrical Expansion East of Huron Parkway Bidpack 02 - UM HV Ductbank
Post-Bid
Ann Arbor, MI 48109

Rest Areas and Welcome Centers Across the State
Term Contract
Results

211 Monroe Parking Lot Resurfacing
Results
Less than $24,134 est. value
Saline, MI

Land Improvement Building Number 1009965 IT Conduit Installation - Oxford to North Campus Bidpack 02 - Oxford to North Campus
Post-Bid
Ann Arbor, MI

WWTP Electrical Preventative Maintenance
Results
Less than $143,747 est. value
Ann Arbor, MI

Multiple Buildings - Oxford Housing Standby Power Upgrades
Post-Bid
Ann Arbor, MI 48109

0.76 MI of Hot Mix Asphalt Shared use Path with Helical Pile Supported Timber Boardwalk, Concrete Sidewalks, Culverts, and Drainage along Grand Street Mill Creek Trail
Results
Dexter, MI 48130

2020 Construction Season - Fuller Court and Nixon/Traver Blvd Sidewalk Gap Project
Post-Bid
Ann Arbor, MI

Interior LED Lighting Retrofit, LED Replacement Fixtures and Lighting Controls
Results
Ann Arbor, MI

Jackson and Washtenaw Sidewalk Gap Elimination Project
Post-Bid
Ann Arbor, MI

Pierce Lake Golf Course Cart Path and Roadway Reconstruction
Results
Chelsea, MI

2020 Ramp and Sidewalk Repair Program
Post-Bid
Ann Arbor, MI

Fence Installation, Mowing, Brush Removal, and Winter Maintenance Services
Term Contract
Results
Manchester, MI 48158

Last Updated 09/09/2020 12:06 PM
Project Title

Woodland Center Correctional Facility Security System Upgrades – Phase II

Physical Address View project details and contacts
City, State (County) Whitmore Lake, MI 48189   (Washtenaw County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Electric, Fencing, Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Remove and replace existing sliding gates, relocate one man-gate, furnish and install new guard hut with associated electrical and plumbing connections. Remove and install part of the existing sally port fence and security systems (FlexZone, Shaker Cable, Hydra wireless and Stun fence) including temporary installation during construction period. Replace sections of existing concrete walk and concrete drive.

Details

Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents