Similar Projects
Zhou Brothers Art Center
Renovation
Design
$20,000,000 est. value
Kansas City, MO 64127

Sephora
Renovation - 2,500 SF
Design
MO 64081

One Nine Vine Mixed-Use Apartments
New Construction
Post-Bid
Kansas City, MO 64108

One Nine Vine Mixed-Use Apartments
New Construction
Post-Bid
Kansas City, MO 64108

Construction Manager at Risk - City Hall Garage and South Plaza Restoration
Renovation
Results
Kansas City, MO 64106

CVS #4088 Site Work Bulk Bid Package
Renovation
Construction
Less than $100,000 est. value
Lees Summit, MO 64081

Pioneer Plaza Price Chopper Grocery Store
New Construction - 49,000 SF
Pending Verification
$5,000,000 to $10,000,000 CJ est. value
Kansas City, MO 64134

Multifamily and Office Redevelopment
Renovation
Pending Verification
$60,000,000 est. value
Kansas City, MO 64106

Bally's Parking Garage
Addition
Design
Kansas City, MO

Sam Rodgers Place
New Construction - 76,444 SF
Post-Bid
Kansas City, MO 64124

Embassy Suites Hotel
Renovation - 411,454 SF
Pending Verification
Kansas City, MO 64106

Cargo Largo Retail Stores
New Construction - 531,000 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Independence, MO

H&M Renovation
Renovation - 22,510 SF
Post-Bid
Kansas City, MO 64112

Kansas City Town Development
New Construction - 1,000,000 SF
Pending Verification
$200,000,000 est. value
Kansas City, MO 64151

Walmart Supercenter #1094-246 - OGP-CE
Renovation - 176,045 SF
Design
Raytown, MO

Last Updated 04/18/2022 10:12 AM
Project Title

Three Light

Physical Address View project details and contacts
City, State (County) Kansas City, MO 64108   (Jackson County)
Category(s) Commercial, Heavy and Highway, Residential
Sub-Category(s) Apartments/Condominiums, Parking Garage, Retail
Contracting Method Bids by Invitation.
Project Status Seeking Site Plan Approvals
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Retail, 7,600 SF New Construction, 1 Building, Apartments/Condominiums, 26 Stories Above Grade, New Construction, 288 Unit(s), Parking Garage, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Carpeting, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Signage, Telephone Specialties, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Assemblies, Metal Storage Shelving.
Division 11 - Equipment, Vehicle and Pedestrian Equipment, Loading Dock Equipment, Residential Equipment, Residential Appliances.
Division 12 - Furnishings, Casework, Rugs and Mats, Office Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), HVAC Insulation, Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Distributed Audio-Video Communications Systems, Paging Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents