Similar Projects
Bridge Repairs and Resurfacing; Milepost 0 to 92; and the Pearl Harbor Memorial Turnpike Extension (2020)
Results
Woodbridge, NJ

Order for Professional Services No. P3692 Supervision of Construction Services for Contract No. P100.473, Bridge Repairs and Resurfacing, Milepost 0 to 126 (2020)
Results
$8,800,000 est. value
Woodbridge, NJ

Drawbridge Preventive Maintenance
Results
$20,000,001 to $50,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Drawbridge Preventive Maintenance Contract
Results
$10,000,001 to $20,000,000 est. value

Mid Atlantic Construction IDIQ (MATOC)
Results
$50,000 to $2,000,000 est. value

Commerce Place Bridge Improvements
Results
$305,000 est. value
Mount Holly, NJ 08060

Maintenance Movable Bridge and Tunnel Repair Contract
Results
$10,000,001 to $20,000,000 est. value

Route 130, Charleston Road / Cooper Street (CR 630) to Crafts Creek
Results
$20,000,001 to $50,000,000 est. value
NJ

Wayne Drive Bridge Replacement
Results
Cinnaminson, NJ 08077

Maintenance of Bridges, Equipment and other Facilities
Term Contract
Results
$1,270,933 est. value
Palmyra, NJ 08065

Maintenance Orphan Bridge Repair Contract 2020-1, Various Locations, Statewide
Results
Less than $5,000,000 est. value

Maintenance Job Order Contracting (JOC) Bridge Repairs, South – 2019
Results
$5,000,001 to $10,000,000 est. value

Bridge Repairs and Resurfacing - Milepost 0 to 92 and the Pearl Harbor Memorial Turnpike Extension (2021)
Results

Bridge Repairs and Resurfacing; Milepost 0 to 126 (2021)
Results

Last Updated 02/19/2020 10:39 AM
Project Title

Demolition of County Bridge #C4.4 (aka Centerton Road Bridge) over Rancocas Creek - Mount Laurel, Willingboro, and Westampton Townships

Physical Address View project details and contacts
City, State (County) NJ   (Burlington County)
Category(s) Heavy and Highway
Sub-Category(s) Bridge
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $3,977,267
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The project involves the demolition and removal of the existing +/- 310 foot long 5 span steel truss bridge with movable center swing span which includes but not limited to the deck, gear boxes, span drive machinery, piers, fender system, sheeting and steel pile bents. Major items being: Vibration Monitoring LUMP SUM Clearing Site LUMP SUM Removal of Pavement 260 S.Y Temporary Cofferdams at Abut- ments & Piers LUMP SUM Removal of Traffics Stripes 3900 L.F. Clearing Site, BRIDGE (STR. NO. C4.4) LUMP SUM

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 03 - Concrete, Concrete Reinforcing, Precast Structural Concrete.
Division 05 - Metals, Structural Steel Framing, Structural Steel for Bridges, Steel Joist Framing, Steel Joist Girder Framing.
Division 07 - Thermal and Moisture Protection, Expansion Control.
Division 09 - Finishes, High-Performance Coatings.
Division 10 - Specialties, Signage, Traffic Signage.
Division 26 - Electrical, Exterior Lighting, Lighting Poles and Standards, Roadway Lighting.
Division 31 - Earthwork, Embankments, Erosion and Sedimentation Controls, Slope Protection, Gabions, Riprap, Special Foundations and Load-Bearing Elements, Driven Piles.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Rigid Paving, Fences and Gates, Retaining Walls.
Division 34 - Transportation, Bridges.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents