Similar Projects
One South Ocean
New Construction, Build-Out, Demolition - 348,053 SF
Design
$10,000,000 CJ est. value
Boca Raton, FL 33432

Villages of Windsor
New Construction, Infrastructure
Design
$71,000,000 CJ est. value
Boynton Beach, FL 33426

Centrepark Residences
New Construction - 435,675 SF
Post-Bid
$10,000,000 CJ est. value
West Palm Beach, FL 33401

Lee Square
New Construction - 1,217,016 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Lake Worth, FL 33463

Development and Disposition of CRA-Owned Properties-SW Neighborhood for Workforce Housing (Carver Square)
Results
Delray Beach, FL 33344

Development and Disposition of CRA-Owned Properties-SW Neighborhood for Workforce Housing (Carver Square)
Results
Delray Beach, FL 33344

Park Vista Place
New Construction - 15,302 SF
Construction
$3,207,728 est. value
Boynton Beach, FL 33472

Florida Power and Light Corporate Office
New Construction, Build-Out - 225,000 SF
Construction
$97,324,539 est. value
Palm Beach Gardens, FL 33410

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

The Collection at Boca Town Center
Demolition, New Construction, Infrastructure - 180,029 SF
Pending Verification
$90,000,000 CJ est. value
Boca Raton, FL 33431

Walmart Supercenter #2176-225 - OGP-HC
Renovation - 850 SF
Design
Jupiter, FL 33458

AutoZone #5999 / Wellington (Loxahatchee Grove)
New Construction, Infrastructure - 7,381 SF
Post-Bid
$1,500,000 CJ est. value
Village of Wellington, FL 33414

Rehabilitation of 1278 White Pine Drive
Renovation
Results
Wellington, FL 33414

Alina Residences
New Construction - 3,889,125 SF
Construction
$111,001,066 est. value
Boca Raton, FL 33432

Bristal at Boca Raton / Senior Living Facility
Demolition, New Construction, Infrastructure - 331,605 SF
Pending Verification
$89,000,000 CJ est. value
Boca Raton, FL 33432

Last Updated 04/06/2023 02:05 PM
Project Title

Tuttle Royale

Physical Address View project details and contacts
City, State (County) Royal Palm Beach, FL 33411   (Palm Beach County)
Category(s) Commercial, Education, Entertainment/Recreation, Heavy and Highway, Medical, Residential
Sub-Category(s) Apartments/Condominiums, Clubhouse/Social Club, Fitness Center, Food/Beverage Service, Hotel/Motel, Medical Office/Outpatient, Office, Paving/Reconstruction, Retail, Single-Family Homes, Site Development, Vocational School
Contracting Method Bids by Invitation
Project Status Construction Commenced, Construction start expected March 2023
Bids Due View project details and contacts
Estimated Value $279,600,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

As of March 8, 2023, construction is underway. A timeline for completion has not been confirmed, however, the first units are expected to be ready and on the market by Q4, 2024. The project scope includes the new construction of 1,100 residential units, 500,000-square-feet of retail, office and medical office space, a charter school, a 400,000-square-foot lifestyle and activity center with a hotel, restaurant space and fitness amenities, all on 200 acres. Scope details have not been released. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Details

New Construction, New Construction. New Construction, New Construction.
Division 01 - General Requirements, Construction Facilities, Field Offices and Sheds, Sanitary Facilities, Construction Aids, Temporary Scaffolding and Platforms.
Division 03 - Concrete, Concrete Forming and Accessories, Concrete Forming, Concrete Accessories, Concrete Reinforcing, Cast-in-Place Concrete, Structural Concrete, Precast Concrete, Precast Structural Concrete, Precast Concrete Slabs, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Structural Steel Framing, Structural Steel for Buildings, Steel Joist Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Sheet Metal Waterproofing, Thermal Protection, Thermal Insulation, Weather Barriers, Built-Up Bituminous Roofing, Flashing and Sheet Metal, Joint Sealants.
Division 08 - Openings, Doors and Frames, Metal Doors and Frames, Metal Frames, Metal Doors, Wood Doors, Plastic Doors, Specialty Doors and Frames, Special Function Doors, Cold Storage Doors, Panel Doors, Sectional Doors, Entrances, Storefronts, and Curtain Walls, Entrances and Storefronts, Entrances, Automatic Entrances, Sliding Automatic Entrances, Windows, Hardware, Door Hardware, Glazing, Mirrors, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Gypsum Board, Tiling, Ceilings, Acoustical Ceilings, Flooring, Specialty Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting and Coating, Painting, Exterior Painting, Interior Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Metal Storage Shelving, Wardrobe and Closet Specialties, Closet and Utility Shelving, Flagpoles.
Division 11 - Equipment, Loading Dock Equipment, Refrigerated Display Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Residential Equipment, Residential Appliances, Foodservice Equipment, Foodservice Storage Equipment, Refrigerated Food Storage Cases, Walk-In Coolers, Foodservice Shelving, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Soda Fountain Equipment, Ice Machines, Cleaning and Disposal Equipment, Educational and Scientific Equipment, Audio-Visual Equipment, Athletic Equipment, Exercise Equipment, Play Field Equipment and Structures, Healthcare Equipment, Medical Sterilizing Equipment, Examination and Treatment Equipment, Patient Care Equipment, Collection and Disposal Equipment.
Division 12 - Furnishings, Art, Window Treatments, Window Blinds, Curtains and Drapes, Casework, Countertops, Furnishings and Accessories, Furnishing Accessories, Waste Receptacles, Rugs and Mats, Entrance Floor Mats and Frames, Office Furniture, Seating, Hospitality Furniture, Institutional Furniture, Classroom Furniture, Site Furnishings, Trash and Litter Receptacles.
Division 13 - Special Construction, Special Activity Rooms, Athletic Rooms, Radiation Protection.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Suppression Sprinkler Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Common Work Results for Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures, Commercial Plumbing Fixtures, Healthcare Plumbing Fixtures, Drinking Fountains and Water Coolers, Drinking Fountains, Compressed-Air Systems for Laboratory and Healthcare Facilities, Vacuum Systems for Laboratory and Healthcare Facilities, Gas Systems for Laboratory and Healthcare Facilities, Chemical-Waste Systems for Laboratory and Healthcare Facilities, Processed Water Systems for Laboratory and Healthcare Facilities.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, HVAC Insulation, Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods, Central Heating Equipment, Central Cooling Equipment, Central HVAC Equipment.
Division 25 - Integrated Automation, Integrated Automation Network Equipment.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Medium-Voltage Electrical Distribution, Power Distribution Units, Battery Equipment, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Special Purpose Lighting, Healthcare Lighting, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Area Lighting, Site Lighting, Flood Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Data Communications, Voice Communications, Call Management, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems, Distributed Audio-Video Communications Systems, Paging Systems, Healthcare Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Electronic Surveillance, Video Surveillance, Electronic Detection and Alarm, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Site Clearing, Clearing and Grubbing, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Base Courses, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Irrigation, Planting Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents