Similar Projects
ADA Trail in South Side Park
New Construction - 2,200 SF
Conception
$500,000 to $1,000,000 CJ est. value
Pittsburgh, PA 15210

SR 1001 over Tributary to Susquehanna River
Demolition, New Construction, Infrastructure
Conception
$675,000 CJ est. value
Scott, PA 17815

Pittsburgh Glass Center
Addition, Demolition, Infrastructure
Design
$2,000,000 CJ est. value
Pittsburgh, PA 15206

Skinny Building & Roberts Building Renovation
Demolition, New Construction, Renovation, Infrastructure
Design
$700,000 CJ est. value
Pittsburgh, PA 15222

Rehabilitation of the Roberto Clemente (6th Street) Bridge
Infrastructure
Post-Bid
$34,400,000 CJ est. value
Pittsburgh, PA 15222

Building Additions and Modifications - New Public Works Facilities
Infrastructure
Post-Bid
$200,000 CJ est. value
Swissvale, PA 15218

McKinley Park Chicken Hill Green Infrastructure Project
Results
Pittsburgh, PA 15123

Summerset at Frick Park - Phase 2 Frick Park Extension
Addition
Results
Pittsburgh, PA 15217

SouthSide Works Town Center
New Construction - 16,632 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15203

SouthSide Works Dog Park
New Construction - 25,358 SF
Construction
$1,000,000 to $5,000,000 CJ est. value
Pittsburgh, PA 15203

Hunt Amory Renovation/Remodel
New Construction, Build-out
Pending Verification
$2,300,000 CJ est. value
Pittsburgh, PA 15206

The Julian Apartments / Pittsburgh
New Construction, Infrastructure
Pending Verification
$48,000,000 CJ est. value
Pittsburgh, PA 15213

US 22/322 PM
Infrastructure
Conception
$2,850,000 CJ est. value
West Hanover, PA 17112

Apex Newbury Apartments
New Construction, Infrastructure - 353,591 SF
Design
$112,000,000 CJ est. value
Bridgeville, PA 15017

Carnegie Park Phase 2 Improvements Pavilion
Infrastructure
Post-Bid
$250,000 est. value
Carnegie, PA

Last Updated 06/07/2023 09:53 AM
Project Title

Memorial Park Improvements Project

Physical Address View project details and contacts
City, State (County) Brackenridge, PA 15014   (Allegheny County)
Category(s) Heavy and Highway
Sub-Category(s) Park/Playground, Site Development
Contracting Method Competitive Bids
Project Status Construction start expected June 2023 , Construction documents
Bids Due View project details and contacts
Estimated Value $203,500 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

**Per Civil Engineer, bid rejected, this will rebid at a later date. The Contractor shall conduct his operations and take all special precautions necessary to protect equipment, utility lines, roadways, and subsurface, submerged and overhead facilities which are to remain in place and undisturbed by his operations under this Contract. The Contractor shall immediately notify the Owner ofthe facilities which are disturbed, damaged or injured as a result ofthe Contractor's operations, and determine the proper method ofreplacing, repairing or restoring the affected facilities at least to the conditions which existed prior to the Contractor's operations. The Contractor shall, at his own expense, replace, repair or restore the affected facilities to their original condition or shall reimburse the Owner ofsaid facilities for such expenses as the said Owner may accrue in performing the work, and the Contractor shall not be entitled to receive\ additional compensation under this Contract for such work. PLEASE NOTE THAT ALL CONTRACTORS MUST ACQUIRE BID DOCUMENTS FROM SENATE DIRECTLY IN ORDER TO BE AN ELIGIBLE BIDDER.

Details

Division 11 - Equipment, Play Field Equipment and Structures, Playground Equipment, Play Structures.
Division 31 - Earthwork, Selective Clearing, Grading.
Division 32 - Exterior Improvements, Athletic and Recreational Surfacing, Site Improvements, Fences and Gates, Planting.
Division 33 - Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents