Similar Projects
Green Alley Improvements - Phase 1
Renovation, Infrastructure
Bidding
River Forest, IL

2022 Pavement Rehabilitation
Infrastructure
Bidding
Tinley Park, IL

Construction Management Services Pavement Preservation and Rehabilitation Services at Various Locations
Post-Bid
Chicago, IL

Asphalt Paving & Related Materials & Services - 3 Year Contract
Renovation, Term Contract
Post-Bid
Chicago, IL 60638

(6.2-Mile) Cleaning and Sealing Longitudinal Cracks in the Existing Concrete Pavement
Results
Chicago, IL 60007

(1.74-Mile) Improvement
Results
Hillside, Westchester, IL 60162

2022 Business Park Street Rehabilitation
Infrastructure
Bidding
Elk Grove Village, IL

2021 Summer Paving
Post-Bid
Buffalo Grove, IL

Crack and Joint Sealing on PCC Pavement
Results
Barrington, Hoffman, Palatine, IL

Asphalt Paving, Sealcoating and Repairs
Infrastructure
Bidding
Northbrook, IL

Grasslands Grading Improvements
Post-Bid
Orland Park, IL

Intersection Improvements
Results
Melrose Park, IL 60158

2022 Pavement Maintenance Improvements
Infrastructure
Bidding
Buffalo Grove, Rolling Meadows, IL 60089

Niles West High School 2021 Paving and Sealcoating
Post-Bid
Skokie, IL 60077

2021 Melinda/Hiawatha Water and Street Improvements
Results
Buffalo Grove, IL 60089

Reported 03/23/2022 04:35 PM
Project Title

Lincoln Yards South Package A-1 & B

Physical Address View project details and contacts
City, State (County) Chicago, IL 60632   (Cook County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method
Project Status Construction Commenced third quarter 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Package A.1 - Extension of West Concord Place to include utilities, paving, streetscape, landscape and retaining walls & railings. Package B - River Wall Partial will include new river wall from Sta. 0+00 to Sta 0+4.36, removal of existing sea wall structures, new river wall, site work, landscaping and accomodations for new sewer outfalls.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents