Similar Projects
Mele & Mele Headquarters
New Construction - 38,000 SF
Conception
$5,000,000 to $10,000,000 CJ est. value
Duquesne, PA 15110

MSI Showroom and Offices
Renovation - 72,825 SF
Conception
Bridgeville, PA 15017

Hill Top Commerce Park - Phase I
New Construction - 8,000 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Noblestown, PA 15071

ADA Drinking Fountains, Borough Building and Tot Lot
Alteration
Bidding
Ingram, PA

Aspinwall WTP Filter Building Sodium Hypochlorite Improvements - Plumbing
Infrastructure
Bidding
Pittsburgh, PA 15238

On-Call Plumbing Services - Allegheny County Airport Authority (Acaa) & Allegheny County Airport (Agc)
Post-Bid
Pittsburgh, PA 15233

On-Call Plumbing Services - 911 Call Center
Post-Bid
Pittsburgh, PA 15233

Aluminum Equipment Shelter
Results
Less than $44,785 est. value

WA-4 Pre-Engineered Storage Building
Results
Pittsburgh, PA 15233

Hospital Storage Room
Renovation - 1,600 SF
Construction
$328,000 est. value
Pittsburgh, PA 15212

Madison Avenue Self Storage Facility
Renovation, Addition - 42,900 SF
Construction
$2,500,000 est. value
Pittsburgh, PA 15212

Amazon Fulfillment Center
New Construction - 2,900,000 SF
Conception
$300,000,000 est. value
Churchill, Pittsburgh, PA 15235

TMP Terminal - Plumbing/Fire Suppression
Alteration
Bidding
Pittsburgh, PA 15231

AGC Terminal First Floor Interior Renovation Phase 3 at Allegheny County Airport - Plumbing Construction
Post-Bid
West Mifflin, PA 15122

South Hills Village Rail Center Pit Restoration and Parking Garage Restoration - Plumbing Contract
Results
Less than $1,000,000 est. value
Pittsburgh, PA 15241

Last Updated 09/30/2021 10:02 AM
Project Title

Moon Golf Club Storage Building - Plumbing Construction

Physical Address View project details and contacts
City, State (County) Moon Township, PA 15108   (Allegheny County)
Category(s) Commercial, Single Trades
Sub-Category(s) Plumbing, Warehouse/Storage
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

The scope of work including installation of floor drains and associated piping; oil/water separator; interior waterline, plumbing fixtures, sanitary sewer and gas lines.

Details

1 Warehouse/Storage, 5,000 SF New Construction.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Metal Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Door Hardware.
Division 09 - Finishes, Flooring.
Division 10 - Specialties, Signage, Flagpoles.
Division 11 - Equipment, Parking Control Equipment.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical, Lighting, Interior Lighting, Exterior Lighting.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents