Similar Projects
Residential Subdivision
New Construction
Conception
Johns Creek, GA 30022

Buckhead Tower Ritz-Carlton and Condos
New Construction
Conception
Atlanta, GA 30326

Dream Atlanta Buckhead
New Construction
Design
Atlanta, GA

The Front Porch at Auburn Avenue
New Construction - 69,600 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Atlanta, GA 30312

Fulton County Housing Rehabilitation Program
Post-Bid
Atlanta, GA 30303

Centennial Yards Pre-Construction Services
Post-Bid
Atlanta, GA

Neighborhood Stabilization Program
Results
Less than $840,107 est. value
Atlanta, GA

Demolition Project
Results
Milton, GA

Castleberry Park
New Construction - 350,000 SF
Construction
$33,000,000 est. value
Atlanta, GA

Bethel Towers Apartments
Renovation
Construction
Atlanta, GA

903 Peachtree
New Construction - 387,656 SF
Pending Verification
$10,000,000 CJ est. value
Atlanta, GA 30309

Thrive Sweet Auburn
New Construction
Pending Verification
$20,000,000 est. value
Atlanta, GA

Six West
New Construction
Conception
College Park, GA

159 Ralph McGill
Renovation - 36,000 SF
Design
Atlanta, GA 30308

Weatherization Contractors
Renovation
Post-Bid

Last Updated 01/02/2020 02:21 PM
Project Title

Encore

Physical Address View project details and contacts
City, State (County) Duluth, GA   (Fulton County)
Category(s) Residential
Sub-Category(s) Apartments/Condominiums, Single-Family Homes
Contracting Method Owner to Subcontract.
Project Status Design Development
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Apartments/Condominiums, New Construction, 161 Unit(s), 304 Single-Family Homes, New Construction, 145 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents