Similar Projects
ADA Compliance and Pedestrian Signal Upgrades
Infrastructure
Bidding

Resurfacing of Various Streets 2021-2023
Term Contract, Infrastructure
Bidding
Mount Vernon, NY

Safe Routes to School Program, Clinton Street
Term Contract
Post-Bid
Buffalo, NY 14202

Resurface POV Parking Areas, Amherst USARC, Amhersy, NY
Post-Bid
Amherst, Williamsville, NY

Reconstruct Iroquois Drive - Phase 2 at Buffalo State College
Results
$2,500,000 to $5,000,000 est. value
Buffalo, NY 14222

Highway Rehabilitation on NY 354 (Clinton St)
Results
Cheektowaga, Elma, West Seneca, NY 14059

Cazenovia Park Parkway Improvements, Group 993A
Infrastructure
Bidding
Buffalo, NY

Summer Highway Maintenance
Term Contract
Post-Bid
Buffalo, NY 14202

West Main Street Extension
Term Contract
Results
Lancaster, NY 14086

Crack Fill, Seal Coat and Striping
Post-Bid
Williamsville, NY 14221

Maple Road (CR192) Rehabilitation
Results
Buffalo, NY 14202

Asphalt Paving
Post-Bid

Pavement Rehabilitation - Walden Avenue from Genesee to Sycamore
Term Contract
Results
Buffalo, NY 14202

Milnor Avenue and Keever Avenue Mill and Overlay
Post-Bid
Lackawanna, NY 14218

Mill and Resurfacing with ADA Curb Ramps and Drainage Improvements
Results
Less than $5,000,000 est. value
Hamburg, Lackawanna, NY 14075

Last Updated 06/14/2021 08:06 AM
Project Title

Young Street Corridor Improvements

Physical Address View project details and contacts
City, State (County) Tonawanda, NY   (Erie County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,325,865
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Reconstruction of 500 of Young Street at Main Street. Work includes removal and replacement of existing asphalt roadways with concrete and permeable brick pavers, reinforced soil construction of a new timber pavilion, replacement of the existing light poles, insulation of the exisitng restroom and installation of new arches and Signage. A timber pavilion will also be constructed at the east end of the site along with a signature gateway arch at the entrance near Main Street and 2 smaller arches on an adjacent sidewalk.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents