Similar Projects
Reported | 07/13/2022 12:00 AM |
Project Title | Horn Dich Lateral F Berkey Tile Replacement Project |
Physical Address | View project details and contacts |
City, State (County) | Goshen, IN (Elkhart County) |
Category(s) | Single Trades |
Sub-Category(s) | Flooring |
Contracting Method | Competitive Bids. |
Project Status | Request for Proposals (RFPs), Construction Start Expected August 2022 |
Bids Due | View project details and contacts |
Estimated Value | $250,000 [brand] Estimate |
Plans Available from | County Agency |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | The project is located in Section 28 of Clinton Township. The project scope involves replacing approximately 3,150 L.F. of existing tile from the south side of County Road 38 (STA 706+00), south to the open ditch beginning on the north side of a wood lot (STA 674+40) with 15" tile. The proposed tile will follow the approximate existing route. Additionally, approximately 800 L.F. of ditch maintenance will be performed along the open section (STA 674+40 to STA 666+40). The work will be performed in an area less than 150 feet wide along the proposed route of tile. |
||
Details |
|
||
Bidder's List | View project details and contacts | ||
Prospective Bidders | View project details and contacts | ||
Project Documents |
![]() Engineered Spec Sheet ![]() Architectural Plans ![]() Other Documents |