Similar Projects
New Flooring
Alteration
Bidding
$154,000 est. value
Elizabeth, IN

Indiana Dunes National Park Interior Painting & Flooring Replacement
Term Contract
Bidding
$100,000 to $250,000 est. value
Porter, IN 46304

Purdue University Veterinary Medicine Teaching Hospitals-Finish Flooring Package 3
Post-Bid
West Lafayette, IN 47907

2021 Terrazzo Repairs and Re-Finishing
Post-Bid
Fort Wayne, IN

BL237 Wright Quad Kitchen Flooring/New Equipment
Results
Bloomington, IN 47408

2021 PPI Flooring Replacements
Results
Fort Wayne, IN 46800

Wood Floor Restoration
Post-Bid
IN

Classrooms Finish Flooring at Washington Middle School
Renovation
Results
Evansville, IN 47714

Flooring Replacement Riley High School
Post-Bid
South Bend, IN 46613

Classrooms Finish Flooring at Hebron Elementary School
Renovation
Results
Evansville, IN 47714

Henry South Evans ES Flooring Replacement
Post-Bid
Hobart, IN

Tile Replacement of the William Bickel Regulated Tile Drain
Alteration
Results
Auburn, IN

Carpet Replacement Abraham Lincoln Elementary School
Post-Bid
Indianapolis, IN

Morris Performing Arts Center - Main Level Slab Replacement
Infrastructure, Alteration
Results
South Bend, IN 46601

Carpet Replacement Jeremiah Gray Elementary School
Post-Bid
Indianapolis, IN 46237

Reported 07/13/2022 12:00 AM
Project Title

Horn Dich Lateral F Berkey Tile Replacement Project

Physical Address View project details and contacts
City, State (County) Goshen, IN   (Elkhart County)
Category(s) Single Trades
Sub-Category(s) Flooring
Contracting Method Competitive Bids.
Project Status Request for Proposals (RFPs), Construction Start Expected August 2022
Bids Due View project details and contacts
Estimated Value $250,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The project is located in Section 28 of Clinton Township. The project scope involves replacing approximately 3,150 L.F. of existing tile from the south side of County Road 38 (STA 706+00), south to the open ditch beginning on the north side of a wood lot (STA 674+40) with 15" tile. The proposed tile will follow the approximate existing route. Additionally, approximately 800 L.F. of ditch maintenance will be performed along the open section (STA 674+40 to STA 666+40). The work will be performed in an area less than 150 feet wide along the proposed route of tile.

Details

Division 09 - Finishes, Flooring.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents