Similar Projects
Construction of NCA and T Fort IRC 25-Ton Chiller Replacement
New Construction, Alteration
Bidding
Greensboro, NC

PTI Cooling Tower and Chiller Replacement
Alteration
Bidding
Greensboro, NC

Construction of Ductwork Modifications
Post-Bid
Greensboro, NC 27411

HVAC Repair and Maintenance Services
Term Contract
Post-Bid
NC

Chiller Maintenance for the Engineering and Inspections Department
Term Contract
Results
Greensboro, NC 27401

Cooling Tower Replacement Smith High School Project
Results
Greensboro, NC 27406

HVAC Water Treatment
Term Contract
Post-Bid
Greensboro, NC 27401

High Point Mental Health HVAC Renovations
Results
High Point, NC 27260

Chiller Plant Replacement for Southern Elementary School
Post-Bid
Greensboro, NC 27406

Northwest High Gym AC
Results
Greensboro, NC 27409

Pleasant Garden Cooling Tower Replacement
Post-Bid
Pleasant Garden, NC 27313

Southwest Elementary School - HVAC Renovation
Results
High Point, NC 27265

Jet Bridges Pc Air And Gpus
Post-Bid
Greensboro, NC

HVAC Maintenance Services
Term Contract
Results
$15,696 est. value
Greensboro, NC 27403

Air Conditioning System Trainer With H-Block
Post-Bid
Greensboro, NC 27407

Last Updated 09/07/2021 11:10 AM
Project Title

Proctor Hall Cooling Tower Replacement

Physical Address View project details and contacts
City, State (County) Greensboro, NC   (Guilford County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents