Similar Projects
District 2 On-Call Util Location Service
Term Contract, Infrastructure
Post-Bid
$5,000,000 est. value

Parkview Avenue / Wenzel Circle Mill and Overlay Improvements
Infrastructure
Post-Bid
$200,000 est. value
Eagle, NE

ACC Overlay Improvements
Infrastructure
Results
Plattsmouth, NE

PC Concrete Pavement Repair
Infrastructure
Results
Plattsmouth, NE

SID5 Bay Hills Public Parking Lot
Infrastructure
Construction
$116,592 CJ est. value
Plattsmouth, NE 68048

SID5 Bay Hills Public Parking Lot
Infrastructure
Construction
$116,592 CJ est. value
Plattsmouth, NE 68048

New Wastewater Treatment Plant - Contract 1 Site Pre-Grading
Infrastructure
Post-Bid
$260,000 est. value
Plattsmouth, NE

15th Street Pavement Extension
Infrastructure
Results
Plattsmouth, NE 68048

2022 PC Concrete Street Repair Project
Infrastructure
Post-Bid
$400,000 CJ est. value
Plattsmouth, NE 68048

15th Street Paving Extension
Infrastructure
Results
Plattsmouth, NE 68048

2022 EMS Building
New Construction, Infrastructure
Post-Bid
$2,000,000 CJ est. value
Weeping Water, NE 68463

Vireo Parkway Paving Improvements
Infrastructure
Results
$840,000 est. value
Plattsmouth, NE

Webster Boulevard Right Turn Lane at 1st Avenue
Infrastructure
Post-Bid
$200,000 CJ est. value
Plattsmouth, NE 68048

Fourmile Industrial Park Water Main Extension
Infrastructure
Results
$233,004 CJ est. value
Plattsmouth, NE 68048

Weeping Water Southeast
New Construction, Infrastructure
Post-Bid
$690,000 CJ est. value
Weeping Water, NE 68463

Last Updated 01/27/2023 04:02 PM
Project Title

Lake Wa-Con-Da 2023 Chip Seal, Sanitary and Improvement District No. 1 of Cass County

Physical Address View project details and contacts
City, State (County) Plattsmouth, NE 68048   (Cass County)
Category(s) Heavy and Highway
Sub-Category(s) Maintenance, Paving/Reconstruction, Site Development
Contracting Method Competitive Bids
Project Status All Bids Received, Selection Underway, Construction start expected February 2023
Bids Due View project details and contacts
Estimated Value $238,290 [brand] Estimate
Plans Available from Civil Engineer
Owner View project details and contacts
Architect View project details and contacts
Description

all labor, materials, use of Contractor's equipment, plant and all else necessary to construct properly all of the improvements within the improvement generally designated Lake Wa-Con-Da 2023 Chip Seal, Sanitary and Improvement District No. 1 of Cass County, Nebraska. At such hour, or as soon as practicable thereafter, the Board of Trustees of the District will proceed to open in the presence of all bidders and consider the bids received for the furnishing of such labor, materials, and equipment necessary for the proper construction of such improvements. The extent of the work consists of the construction or other effectuation of the items listed below and other related preparatory and subsidiary work from issuance of the Notice to Proceed: Item; Description; Approx. Quantities: 1 Mobilization; 1 LS 2 Subgrade Stabilization with Grading to Establish Road Cross Section; 3,400 SY 3 Asphalt Emulsion CSS-1, in place; 10,200 GAL 4 Asphalt Chip Seal Surface, in place; 43,400 SY 5 Rebuild roadway section (Sta. 127+25 to Sta. 133+25); 1 LS 6 Deliver and Stockpile Limestone Chips; 35 TON Each bid must be accompanied in a SEPARATE SEALED ENVELOPE by a certified check drawn on a bank whose deposits are insured by the Federal Deposit Insurance Corporation in the amount of $11,900.00, payable without condition to the Treasurer, Sanitary and Improvement District No. 1 of Cass County, Nebraska, or a bid bond for a like amount as evidence of good faith of the bidder and as agreed upon liquidated damages to the District in the event of the bidder whose proposal is accepted by the Board of Trustees of the District fails to enter into contract within ten (10) days after Notice of Award and furnish acceptable bond to complete the work and pay for all labor done and materials used, such bond to be in the amount of 100% of the total bid price. No bidder may withdraw his proposal for a period of thirty (30) days after the date set for the opening of bids. Sanitary and Improvement District No. 1 of Cass County, Nebraska, reserves the right to waive informalities and to reject all or any bids.

Details

Division 32 - Exterior Improvements, Operation and Maintenance of Exterior Improvements.
Division 34 - Transportation, Operation and Maintenance of Transportation.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents