Similar Projects
Northway Church Sanctuary
New Construction, Demolition
Conception
Dallas, TX 75229

First Mexican Baptist Church
New Construction, Demolition
Conception
Dallas, TX 75229

Mulberry Springs Baptist Church Sanctuary
New Construction - 19,800 SF
Design
$3,000,000 est. value
Hallsville, TX 75650

Cross of Grace Church
Addition - 2,857 SF
Design
El Paso, TX 79903

St Paul`s Presbyterian Church
Renovation - 2,928 SF
Post-Bid
Needville, TX 77461

Saints Constantine & Helen Antiochian Orthodox Church
Renovation - 12,900 SF
Post-Bid
Carrollton, TX 75007

The Door Christian Fellowship Church
New Construction - 50,000 SF
Construction
$4,000,000 est. value
San Antonio, TX 78227

Springtown Baptist Temple
Addition
Construction
Springtown, TX 76082

Fellowship of Believers Baptist Church
New Construction
Conception
Pearland, TX 77584

Carpenter's Way Annex Renovations
Renovation - 5,500 SF
Design
$350,000 est. value
Lufkin, TX 75904

Prince Of Peace Lutheran Church - Phase I Addition And Alteration
Renovation - 33,588 SF
Post-Bid
Carrollton, TX 75007

First Baptist Church of Dallas Horner Building
Addition
Construction
Dallas, TX 75201

Christ Church Cathedral
Renovation
Conception
Houston, TX 77002

Lighthouse Christian Fellowship Church
Renovation - 15,700 SF
Design
$400,000 est. value
Prosper, TX 75078

Zion Hill Church Restoration
Renovation
Post-Bid
Less than $1,200,000 est. value
Nacogdoches, TX 75963

Last Updated 06/24/2020 04:21 PM
Project Title

McAllen LDS Temple

Physical Address View project details and contacts
City, State (County) McAllen, TX 78504   (Hidalgo County)
Category(s) Religious/Funeral
Sub-Category(s) Religious Facility
Contracting Method General Contractor to Subcontract.
Project Status Construction Documents
Bids Due View project details and contacts
Estimated Value $5,000,000 to $10,000,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Plans are to construct two buildings for a church and church related uses on the 10.615-acre vacant land. The first building (meeting house) approximately 19,263 square feet, consists of 15 rooms, 9 offices, both women and men restrooms, as well as women and men dressing rooms, a basketball court and a chapel. The chapel has 40 pews, for a seating area capacity of approximately 150 people. Its primary use is for religious worship. The second building approximately 29,732 square feet, consists of 5 instructional rooms, 4 offices, both women and men restrooms, a lobby and multiple dressing rooms.

Details

48,995 SF - 1 Religious Facility, 1 Story Above Grade, Approximately 29,732 SF New Construction, 1 Religious Facility, 1 Story Above Grade, Approximately 19,263 SF New Construction.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete.
Division 04 - Masonry, Unit Masonry.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Ornamental Woodwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Windows, Hardware, Glazing.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Carpeting, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties.
Division 11 - Equipment, Religious Equipment.
Division 12 - Furnishings, Religious Art, Specialty Casework, Religious Casework, Fixed Audience Seating, Pews and Benches.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Water-Based Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications.
Division 28 - Electronic Safety and Security, Fire Detection and Alarm.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents