Similar Projects
Downtown Streetscape Crosswalk Enhancements
Infrastructure
Conception
Santa Maria, CA

New Neighborhood School at Monument Ranch
New Construction
Conception
Perris, CA 92570

Mission Bay Elementary School
New Construction
Design
San Francisco, CA 94158

Delevan Drive Elementary School
Addition
Design
Los Angeles, CA 90065

American Avenue Disposal Site Phase One Waste Relocation
Infrastructure
Bidding
$23,700,000 to $26,200,000 est. value
Kerman, CA 93630

Proposed Grayson Repowering Demolition and Site Improvement
Demolition, Infrastructure
Bidding
Gardena, CA

Preconstruction and Lease-Leaseback Construction Services
Renovation
Post-Bid
$2,640,000 est. value
Gustine, CA 95322

Scott Rd, Pittman Lane, And Barton Banks Rd Street Improvements
Alteration
Post-Bid
Irvine, CA 92602

Shade Structure Installation
Renovation
Results
Mill Valley, CA 94941

SCWP - Site Preparation Project
Infrastructure
Results
Sunnyvale, CA

Cleveland Elementary School New Classroom Building & Interim Housing
New Construction, Demolition - 5,581 SF
Construction
$7,200,000 est. value
San Francisco, CA 94158

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

Pine Ridge Elementary School Class Room Renovation
Renovation, Addition
Conception
$5,400,000 est. value
Magalia, CA 95954

Site Prep SPS Sterilizers and Equipment - Building 126 - 7th Floor
Renovation, Alteration
Design
Long Beach, CA 90822

Mound Fire Reconstruction
Renovation
Bidding
Ventura, CA 93001

Reported 03/10/2022 06:43 PM
Project Title

Forest Hill Elementary School Phase One

Physical Address View project details and contacts
City, State (County) San Jose, CA 95130   (Santa Clara County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method
Project Status Construction Commenced February 2022, Construction Completion Expected December 2022
Bids Due View project details and contacts
Estimated Value $4,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

The furnishing of all labor, equipment and services required for the following referenced project: Forest Hill ES Phase 1 Admin Addition & Site work. The project site, Forest Hill Elementary School, 4450 McCoy Ave, San Jose, CA 95130

Details

Elementary School, New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents