Similar Projects
Maintenance of Supplemental Cooling Systems
Term Contract
Bidding
Atlanta, GA 30334

LK Moss HVAC Replacement
Bidding
Buena Vista, GA 31803

Replace Boiler and Cooling Tower at Douglass High School
Sub-Bidding
Atlanta, GA 30318

Prequalified Contractors List
Post-Bid
East Point, GA

HVAC Air Filters and Related Supplies
Term Contract
Post-Bid
Atlanta, GA 30303

Multi-Site HVAC Rooftop and PTAC Unit Replacement
Results
Atlanta, GA 30324

Sparks Hall Phase 1 HVAC Upgrades
Results
Less than $1,257,900 est. value
Atlanta, GA 30302

City Hall HVAC Purification System
Post-Bid
Alpharetta, GA 30009

Replace 1st and 2nd Floor HVAC Units, Clarkston Campus, Bldg
Results
Atlanta, GA 30302

Rialto and Haas-Howell HVAC Upgrades
Post-Bid
Less than $850,000 est. value
Atlanta, GA 30302

Mechanical Contractor Services - Decatur Campus Building SB Replace Air-Cooled Condensers and AHU DX Cooling Coils
Results
Less than $980,000 est. value
Atlanta, GA 30302

HVAC and Mechanical Products
Term Contract
Post-Bid

Design of Replacement Air Handling Unit
Results
Less than $1,400,000 est. value
Atlanta, GA 30313

GT Campus Recreation Center Chiller Replacement
Results
Atlanta, GA 30318

Kitchen Exhaust System Maintenance Services
Term Contract
Results
Less than $12,000 est. value
GA

Reported 12/16/2020 12:00 AM
Project Title

Clarkston Campus CD Building Install Screw Chiller and Replace AHU Cooling Coil

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30302   (Fulton County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Design-Build. Competitive Bids.
Project Status Accepting Qualifications
Bids Due View project details and contacts
Estimated Value $910,000
Plans Available from State Agency - 11/13/20
Owner View project details and contacts
Architect View project details and contacts
Description

• To Replace existing AHU with a new VAV AHU with VFD. • Demolish existing Compressors and outdoor Condensers • Demolish existing Terminal Mixing Boxes and all fiberglass duct board dual ductwork in corridor ceiling space and select administration areas • Install new centrifugal pumps with VFDs; 1 Hot Water and 1 Chilled Water • Install one (1) new air-cooled screw chiller • Install one (1) new energy recovery unit • Install separate steel support structures for air-cooled screw chiller and energy recovery unit • Install all new VAV hot water coil terminal units, air distribution, and medium pressure ductwork • Convert from pneumatic to DDC controls • Install new 2x2 ceilings in corridors and select administrative areas • Replace 2x4 light fixtures with Owner provided LED light fixtures • Replace wall grills and other ceiling registers.

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents