Similar Projects
Central District Wastewater Treatment Plant - RS Pump Stations Plant 1 - 102608 - Miami-Dade County
Renovation
Conception
$22,527,239 CJ est. value
Key Biscayne, FL 33149

Central District Wastewater Treatment Plant - RS Pump Stations Plant 2 - 102609 - Miami-Dade County
Renovation
Conception
$33,560,040 CJ est. value
Key Biscayne, FL 33149

Boesch Pumps - Fiberglass Basin Installation Guidelines
Renovation
Design
$250,000 CJ est. value
Miami, FL 33186

J. Robert Dean Water Treatment Facility Mechanical Integrity Testing of Deep Injection Well IW-1
Renovation
Bidding
$5,470,697 CJ est. value
Homestead, FL 33034

Wastewater Pump Station Improvements
Renovation
Post-Bid
$6,240,776 CJ est. value
North Bay Village, FL 33141

Diesel Pump Upgrades at J. Robert Dean Water Treatment Plant
Infrastructure
Post-Bid
$1,000,000 CJ est. value
Florida City, FL 33034

Racetrack Water Tower Booster Pump Station
New Construction
Results
$750,000 est. value
Homestead, FL 33035

NW 90th Street Stormwater Lift Station No. 2 and Retention Area
Renovation, Infrastructure
Results
$1,700,000 est. value
Medley, FL 33166

Gateway Key Center
Demolition, New Construction, Infrastructure - 55,844 SF
Pending Verification
$118,472,816 CJ est. value
Homestead, FL 33034

Golden Shores Drainage Repairs & Utility Undergrounding - 20003 - City of Sunny Isles Beach
Infrastructure, Renovation
Conception
$3,600,000 CJ est. value
Sunny Isles Beach, FL 33160

Maurice Gibb Memorial Park
Infrastructure, Renovation
Post-Bid
$4,000,000 CJ est. value
Miami Beach, FL 33139

Alexander Orr Water Treatment Plant Bulk Sodium Hypochlorite Feed and Storage Facility
Infrastructure
Results
$3,861,000 CJ est. value
Miami, FL 33173

Pump Station D Rehabilitation - City of Coral Gables
Renovation
Conception
$1,249,750 CJ est. value
Coral Gables, FL 33143

Racetrack Water Tower Booster Pump Station (Re-Bid)
New Construction
Post-Bid
$899,900 est. value
Homestead, FL 33035

Pump Station 3 Force Main Replacement
Infrastructure
Results
$3,349,930 CJ est. value
Coral Gables, FL 33145

Last Updated 07/25/2023 10:54 AM
Project Title

Alexander Orr Water Treatment Plant West High Service Pump Room Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Miami, FL 33173   (Miami-Dade County)
Category(s) Sewer and Water
Sub-Category(s) Lift and Pump Stations, Sewage Treatment Plant
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected October 2023
Bids Due View project details and contacts
Estimated Value $11,794,378 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Alexander Orr Water Treatment Plant West High Service Pump Room Electrical Upgrades. Scope of Work The project consists of but is not limited to, furnishing materials, labor, and equipment necessary for upgrading the existing electrical equipment within the West High Service Pump Station at the Alexander Orr, Jr. Water Treatment Plant (AOWTP). The upgrades include replacement of the existing high-service pump motors, installation of a standalone prefabricated electrical building, and associated site, electrical, process, mechanical, and structural improvements. The purpose of these upgrades will be to provide greater electrical reliability to pump operations and increase the level of automation of the facility A Virtual Mandatory Pre-Bid Conference has been scheduled to be conducted via MICROSOFT TEAMS. Bidders are encouraged to download and install MICROSOFT TEAMS on their mobile device or laptop that has a camera prior to the meeting date. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Project Duration: 345 Calendar Days to Substantial Completion, 400 Calendar Days to Final Completion, plus a 40 Calendar Day Contingency Period Estimated Range of the Base Bid - $9,747,865.18 to $11,794,378.30 not including contingency and dedicated allowances PCTS No. 16013 ER No. W017290

Details

Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing, Metal Fabrications.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Emergency Aid Specialties, Fire Protection Specialties, Fire Extinguishers, Storage Specialties, Storage Assemblies.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 14 - Conveying Equipment, Scaffolding.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Systems, Distributed Audio-Video Communications Systems.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Access Control, Intrusion Detection, Electronic Surveillance, Electronic Detection and Alarm.
Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates, Turf and Grasses.
Division 33 - Utilities, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Equipment, Water Utility Pumping Stations, Wastewater Utility Pumping Stations, Sanitary Utility Sewerage Force Mains, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.
Division 40 - Process Integration, Water Process Piping.
Division 44 - Pollution and Waste Control Equipment, Common Work Results for Pollution and Waste Control Equipment, Air Pollution Control, Noise Pollution Control, Odor Control, Water Pollution Control Equipment, Solid Waste Control and Reuse, Waste Thermal Processing Equipment, Fluidized Bed Combustion Equipment, Rotary Kiln Incinerators, Pyrolysis Equipment, Hazardous Waste and Medical Waste Incinerators, Heat Recovery Equipment for Waste Thermal Processing, Synthesis Gas Cleanup and Handling Equipment.
Division 45 - Industry-Specific Manufacturing Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents