Similar Projects
Nikiski Community Rec Center AV Upgrade
Alteration
Results
Kenai, AK 99669

North Peninsula Recreation Center Touchless Fixture Upgrade
Alteration
Bidding
Kenai, AK 99611

RSA - Twenty-Three Mile Slough Annual Maintenance
Term Contract, Alteration
Bidding
Fairbanks, AK

Snow Removal Services
Alteration
Post-Bid
$68,000 est. value
Kenai, AK

Port of Alaska Rectifier Refurbishment
Alteration
Post-Bid
$1 to $500,000 est. value
Anchorage, AK

Port of Alaska Rectifier Refurbishment
Alteration
Post-Bid
$1 to $500,000 est. value
Anchorage, AK

Reported 09/18/2021 12:00 AM
Project Title

Port Of Alaska Utility Locates

Physical Address View project details and contacts
City, State (County) Anchorage, AK   (Anchorage County)
Category(s) Sewer and Water, Single Trades
Sub-Category(s) Electric, Plumbing, Security/Communications, Service/Term Contracts, Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Request for Quotations
Bids Due View project details and contacts
Estimated Value Less than $50,000
Plans Available from Municipal Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The Contractor will provide utility locating services within POA property when requested to ensure identification of utility systems owned and maintained by POA. The utilities shall include, but are not limited to; water, sewer and storm drain systems, electrical and communication lines, heat trace, cathodic protection, petroleum, oil and lubricant lines, and gas lines. It may be necessary for the Contractor to coordinate locating services with utility companies to ensure complete and accurate location of utilities. The Contractor will possess a valid Alaska Business License and must be a current certified utility locator. Proof of these requirements will be provided at time of bid opening. The term of this contract shall be one year from the date of award with option to extend for an (1) additional one-year period, subject to appropriation, upon mutual consent of both parties. The contract amount shall not exceed $30,000 per year. POA does not guarantee any minimum or maximum amount of work to be performed under this contract.

Details

Division 03 - Concrete, Precast Concrete.
Division 22 - Plumbing, Common Work Results for Plumbing.
Division 26 - Electrical.
Division 27 - Communications, Common Work Results for Communications.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents