Similar Projects
HVAC Mechanical projects
Renovation
Design
$300,000 CJ est. value
Providence, RI 02909

Reznor Gas Unit Heaters
Term Contract
Design
Providence, RI 02905

HVAC Mechanical System Installation - Rainone Gym
Alteration
Post-Bid
Johnston, RI 02919

Oasis International Installation Of Hvac System
Alteration
Post-Bid
Providence, RI 02907

Purchase and Installation of a Make-Up Air Unit
Alteration
Results
North Providence, RI

Two Building Management Systems (RTU Controls Boiler)
Alteration
Results
North Providence, RI

Hood Cleaning Service (B+4)
Term Contract
Post-Bid
Providence, RI 02908

Construction: Air-Cooled Split Systems with Ducted Ceiling-Mounted Evaporators with EC Motors and Remote Air-Cooled DX Condensers.
Term Contract
Results
$100,000 to $250,000 est. value
Newport, RI 02841

Make-Up Air Heater Unit Project - Nayatt School
Alteration
Post-Bid
Barrington, RI 02806

Quidnessette Elementary School - Rooftop Unit Replacement
Alteration
Results
North Kingstown, RI 02852

First Floor Classroom Air Conditioning Improvements
Alteration
Post-Bid
North Kingstown, RI 02852

HVAC Basis of Design Liebert Model VS070AD Evaporator, Model MCL110E8 Condenser, Roof, Air Conditioning, Electrical
Infrastructure
Results
$100,000 to $250,000 est. value
Newport, RI 02841

HVAC Maintenance & Repairs
Term Contract
Post-Bid
Hyannis, New Bedford, MA - Middletown, Providence, RI 02908

HVAC Upgrades at RWP Natural History Museum
Alteration
Results
Providence, RI 02907

Rooftop HVAC Replacement at Kickemuit Middle School
Alteration
Post-Bid
Warren, RI 02885

Last Updated 06/23/2023 09:08 AM
Project Title

Hathaway Elementary School HVAC and Electrical Upgrades

Physical Address View project details and contacts
City, State (County) Portsmouth, RI 02871   (Newport County)
Category(s) Single Trades
Sub-Category(s) HVAC
Contracting Method Competitive Bids
Project Status Sub-Bidding, Construction start expected June 2024
Bids Due View project details and contacts
Estimated Value $150,000 [brand] Estimate
Plans Available from Agency's Affiliate
Owner View project details and contacts
Architect View project details and contacts
Description

Reference Number 0000320415 Questions are submitted online No Bid Intent Not Available The Portsmouth School Department will receive sealed bids for the following project: Hathaway Elementary School HVAC & Electrical Upgrades No Bids may be withdrawn for a period of 60 calendar days subsequent to the date of the bid opening. The Portsmouth School Department reserves the right to waive any informality and to reject any and all bids or to accept any bids deemed to be in the best interest of the School Department. This project is a prevailing wage project and requires a 5% Bid Bond. The project requires 10% MBE/WBE Participation. The successful bidder will be required to furnish 100% Payment and Performance Bonds at the time of award. In general, the scope of work includes the following: HVAC system replacement (RTU, VRF, vertical unit ventilator with DX cooling) & new electrical service/gear with associated architectural and site scopes of work. Questions during bidding are to be emailed to: a. Philip Conte, StudioJAED contep@studiojaed.com b. Ben Shaffer, StudioJAED shafferb@studiojaed.com c. Jason Leone, StudioJAED leoneJ@studiojaed.com d. David Houled, PSD houled@portsmouthschoolsri.org e. Rachel Marciano, PSD marcianor@portsmouthschoolsri.org f. Erick Andrutis eandrutis@peregrinegrp.com g. Dan Tavares dtavares@compassgrouparch.com h. RFI Questions Due - May 30, 2023 i. Addendum #1 - May 24, 2023 j. Addendum #2 - June 1, 2023

Details

Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution, Central HVAC Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents