Similar Projects
Frito-Lay Automated Distribution Plant and Fulfilment Center
New Construction - 355,000 SF
Conception
$130,000,000 est. value
Poinciana, FL

Universal Forest Products
New Construction - 400,000 SF
Conception
$33,700,000 est. value
Belle Glade, FL 33430

SeaHunter Boats
New Construction - 83,169 SF
Design
Princeton, FL 33032

Oculus Surgical
New Construction - 45,401 SF
Design
$6,900,000 est. value
Port Saint Lucie, FL 34953

Accel International
New Construction, Build-Out - 150,000 SF
Sub-Bidding
$55,000,000 est. value
Port Saint Lucie, FL 34983

Aluminum Fabrication Building Item #T1
New Construction - 30,000 SF
Post-Bid
Panama City, FL

Construction Manager as Constructor for CAE USA Training and Support Center
New Construction - 334,145 SF
Post-Bid
Cape Canaveral, FL

Unifirst - Pompano Beach
New Construction, Addition - 9,056 SF
Construction
$1,200,000 est. value
Pompano Beach, FL 33069

Boston Whaler Expansion
New Construction - 326,000 SF
Construction
$42,000,000 est. value
Edgewater, FL 32141

Gorilla Ammunition
New Construction - 30,000 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
Vero Beach, FL 32967

Paper & Paper Board Fiber Recycling Facility
New Construction - 335,000 SF
Pending Verification
$160,700,000 est. value
Tampa, FL 33605

Coca-Cola Florida Manufacturing and Distribution Center
New Construction - 1,400,000 SF
Conception
$300,000,000 est. value
Brandon, FL 33511

Hoover Architectural
Renovation - 19,998 SF
Design
$500,000 est. value
Fort Lauderdale, FL 33311

Ideal Nutrition Commissary
Build-Out - 42,934 SF
Post-Bid
West Palm Beach, FL 33415

AmeraTrail Headquarters and Manufacturing Plant - Phase 1
New Construction - 85,000 SF
Construction
$2,663,200 est. value
Saint Cloud, FL 34771

Reported 10/14/2021 11:33 AM
Project Title

Fort Pierce Industrial Aggregate Facility

Physical Address View project details and contacts
City, State (County) Fort Pierce, FL 34981   (Saint Lucie County)
Category(s) Industrial/Manufacturing
Sub-Category(s) Manufacturing/Processing Plant
Contracting Method
Project Status Construction Commenced January 2021, Construction Completion Expected June 2022
Bids Due View project details and contacts
Estimated Value $70,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

1 Manufacturing/Processing Plant, 1,800 SF New Construction.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 03 - Concrete, Concrete Reinforcing, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Windows, Hardware.
Division 09 - Finishes, Flooring, Painting and Coating.
Division 10 - Specialties, Signage, Compartments and Cubicles, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Storage Specialties, Lockers.
Division 11 - Equipment, Laboratory Equipment.
Division 12 - Furnishings.
Division 13 - Special Construction.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Fire-Extinguishing Systems.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Power Distribution Units, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications.
Division 28 - Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Video Surveillance, Fire Detection and Alarm.
Division 31 - Earthwork, Site Clearing, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 40 - Process Integration, Water Process Piping, Pneumatic Conveying Lines, Instrumentation and Control for Process Systems.
Division 41 - Material Processing and Handling Equipment, Bulk Material Processing Equipment, Bulk Material Conveying Equipment, Bulk Material Feeders, Batching Equipment, Conveyors, Cranes and Hoists, Specialty Material Handling Equipment, Manufacturing Equipment, Manufacturing Lines and Equipment, Container Processing and Packaging.
Division 44 - Pollution and Waste Control Equipment, Air Pollution Control, Odor Control, Water Pollution Control Equipment, Water Pollution Containment and Cleanup Equipment.
Division 46 - Water and Wastewater Equipment.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents