Similar Projects
Bowling Green High School Phase 4 - Early Site Package
Demolition
Bidding
Bowling Green, KY 42104

Asphalt Pavement and Roadway Rehab - I-165/PW-9007 From MP 0.000 to MP 2.079
Infrastructure
Bidding
KY

Production Avenue Road Extension and Utility Infrastructure
Post-Bid
Bowling Green, KY

Warren County Road
Infrastructure
Post-Bid
Bowling Green, KY 42101

South - Regional Construction MATOC
Results
$500,000 to $1,000,000 est. value

Pavement (with Alternates)
Results
KY

Asphalt Surfacing Ultra Thin
Results
KY

Asphalt Resurfacing
Results
KY

Asphalt Surface With Grade and Drain
Results
KY

Bowling Green Downtown Improvements Phase II
Results
Bowling Green, KY

Asphalt Pavement and Roadway Rehab
Results
KY

Asphalt Resurfacing
Results
KY

Asphalt Resurfacing
Infrastructure
Results
KY

FY22 Street Overlay
Infrastructure
Results
$1,500,000 est. value
Bowling Green, KY

Asphalt Resurfacing
Infrastructure
Results
KY

Reported 11/05/2021 12:00 AM
Project Title

Improve Site Rear Plaza

Physical Address View project details and contacts
City, State (County) Bowling Green, KY 42101   (Warren County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction, Site Development
Contracting Method Competitive Bids.
Project Status Bidding
Bids Due View project details and contacts
Estimated Value
Plans Available from Copy Center
Owner View project details and contacts
Architect View project details and contacts
Description

This project will include improvement to the site that was previously the WKU Foundation building. Upgrades will include landscape walls, paving, concrete stairs, landscape plants, site lighting, and power. The entire site shall be considered to be unclassified with regard to excavation. Storm water management compliance shall be the responsibility of the contractor including NOI, inspections, and reports. The main campus of WKU is an MS-4 permitted storm water entity. Silt fencing placement and maintenance is the responsibility of the contractor. Due care shall also be taken and to minimize any dirt/mud/debris from being introduced to the adjacent public roadways and the contractor shall be fully responsible for the cleanliness of the surrounding sidewalks, roadways, and surrounding property. The site shall be kept clean and landscaped. There may be events in the chapel that will require the contractor to clean up around the site in addition to every day job clean up. The surrounding site shall be protected during construction. The adjacent buildings (CAC, WAB, and the Chapel) will be in operation during the duration of the project. Fencing and other methods needed to protect these structure and the safety of pedestrians shall be provided by the contractor.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 02 - Existing Conditions, Subsurface Investigation.
Division 31 - Earthwork, Grading, Earthwork Methods.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents