Similar Projects
Interstate 275 Express Lane - Florida Department of Transportation
Infrastructure
Conception
$10,000,000 est. value
Saint Petersburg, FL 33747

Roadway Safety and Community Mobility
Infrastructure
Bidding
$123,000 est. value
Pinellas Park, FL

Countywide ARPA, Sidewalk, Drainage, and Road Resurfacing
Infrastructure
Bidding
$32,000,000 est. value
Clearwater, FL

2021 Asphalt Patching Services
Post-Bid
Saint Pete Beach, FL

Imagine Clearwater Park (Buildings, Hardscape, Landscape and Other Site Improvements)
New Construction
Post-Bid
$65,000,000 est. value
Clearwater, FL 34621

Roadways and Public Rights-of-Way Minor Improvements
Results
Saint Petersburg, FL 33731

Jail Perimeter Road Modification into Ditch Behind F-Wing
Results
Less than $1,165,522 est. value
Clearwater, FL 33762

CASA - Repaving of Parking Lots
Construction
Saint Petersburg, FL 33705

Z2PZ--Construction for Paving of the Gravel Parking Lots at the St. Petersburg, FL. Regional Office
Post-Bid
$1,000,000 to $2,000,000 est. value
Saint Petersburg, FL

49th Street and 38th Avenue North Intersection Improvements
Results
Less than $1,051,945 est. value
Clearwater, FL 33710

SNL Infrastructure Construction and Maintenance
Infrastructure
Post-Bid

119th Avenue Beautification
Results
Less than $85,000 est. value
Treasure Island, FL 33706

East Bay Drive - Turn Lane Improvements
Alteration
Post-Bid
Largo, FL 33779

Mill and Overlay on Various Street Locations
Results
$1,089,600 est. value
Dunedin, FL

Ralph Richards Tower Root Grinding and Asphalt Repairs
Infrastructure
Post-Bid
Clearwater, FL 33756

Reported 07/07/2022 11:36 AM
Project Title

Pinellas Trail Loop Phase 4 from 126th Avenue North to Ulmerton Road - County of Pinellas

Physical Address View project details and contacts
City, State (County) Largo, FL 33773   (Pinellas County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Conceptual Design, Construction Start Expected June 2024
Bids Due View project details and contacts
Estimated Value Less than $2,180,830
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

A more detailed scope is expected to be released on a future date. As of July 6, 2022, this project is in the conceptual phase. Information regarding a design team and the contractor selection has not been disclosed. Although a firm timeline for construction has not been determined, construction is not expected to start prior to fiscal year 2024. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents