Similar Projects
Paving, Signage, and Lighting Infrastructure for Union Park Phase 6C
Infrastructure
Bidding
Little Elm, TX

Paving, Signage, and Lighting Infrastructure for Union Park Phase 9
Infrastructure
Bidding
Little Elm, TX

Jernigan Road Overlay
Post-Bid
Copper Canyon, TX 75077

Paving, Signage, and Lighting Infrastructure for Union Park Phase 6A
Post-Bid
Little Elm, TX

Driveway Resurface Project
Results
$100,000 to $250,000 est. value
Denton, TX 76209

Southern Region Disaster Recovery Support BPA
Results

Paving Facilities to Serve Harvest Phase 14
Infrastructure
Bidding
Northlake, TX 76226

Phase 1 - Grading, Paving, and Utility Package for Stone Hill Ranch Estates
Post-Bid
TX

DNT Frontage Road from FM 428 to Grayson County Line
Results
$18,986,710 est. value
Pilot Point, TX 75258

North Texas Blvd Widening & Improvements at Apogee Stadium
Infrastructure
Bidding
Denton, TX 76209

2021 Street Improvement
Post-Bid
Argyle, TX

Canyon Falls and Dale Earnhardt Way Pavement Repairs
Results
Northlake, TX 76226

2021 Street Reconstruction Projects
Post-Bid
Aubrey, TX

Old Justin Road Pavement Reconstruction
Results
Northlake, TX 76226

Concrete Labor and Material and Asphalt Paving Labor and Material
Infrastructure
Post-Bid
Sanger, TX

Last Updated 03/14/2022 09:49 AM
Project Title

Southeast Denton Neighborhood Area B (SED-B)

Physical Address View project details and contacts
City, State (County) Denton, TX   (Denton County)
Category(s) Heavy and Highway
Sub-Category(s) Paving/Reconstruction
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $13,500,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Full depth reconstruction of 45 street segments within the Southeast Denton neighborhood. This includes road reconstruction with subgrade stabilization, asphalt paving, concrete curb and gutter, and driveway replacements (limited to driveways that are within the existing right-of-way). The project will adhere to a holistic approach aimed at limiting future construction disruptions by replacing other aging public infrastructure within the limits of the project area. This includes replacing existing aging water and sanitary sewer lines, select stormwater infrastructure, limited sidewalk improvements, and street lighting.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents