Similar Projects
Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

CA NP GOGA 469(1) China Beach Access Road
Term Contract, Infrastructure, Alteration
Design
$4,500,000 to $7,000,000 est. value
Mill Valley, San Francisco, CA 94941

2022 Pavement Digout Project
Infrastructure
Bidding
$400,000 est. value
San Francisco, San Rafael, CA 94903

Pavement Replacement
Infrastructure
Bidding
$280,000 est. value

Manila Highway 255 Shared Use Path
Alteration
Post-Bid
$888,055 est. value

CA NPS 2021(1), Pavement Preservation Bay Area
Term Contract
Post-Bid
$2,000,000 to $3,000,000 est. value
Danville, Martinez, Mill Valley, San Francisco, CA 94526

East Blithedale Rehabilitation Project - Phase I
Alteration
Results
$3,000,000 est. value
Mill Valley, CA

Downtown Rehabilitation Project - Phase II
Alteration
Results
$600,000 to $800,000 est. value
Mill Valley, CA

Remove and Replace Bike Path Asphalt and Repaint Existing Bike Path Lines, Arrows and Symbols
Term Contract
Bidding
Corte Madera, CA 94925

2022 Annual Pavement Rehabilitation Project Contract 1 - Roadway Preparation and Concrete Work
Alteration
Post-Bid
Novato, CA

2021 Northern Region Road Rehabilitation: Phase 2
Infrastructure
Results
$650,000 est. value
CA

Place Polyester Concrete Overlay, Place HMA, Cold Plane AC Pavement
Infrastructure
Bidding
$2,540,000 est. value
CA

2021 Redwood Highway Frontage Road Pavement Repair Phase 1
Infrastructure
Results
$350,000 est. value
Mill Valley, CA 94941

2021 Road Sealant, Phase 2
Infrastructure
Results
CA

Multi-Use Pathway Pavement Maintenance Project
Infrastructure
Results
$190,000 est. value
San Rafael, Sausalito, CA 94965

Last Updated 04/06/2022 01:37 PM
Project Title

Primary #3 Corrosion Rehabilitation

Physical Address View project details and contacts
City, State (County) Marina, CA   (Marin County)
Category(s) Heavy and Highway, Single Trades
Sub-Category(s) Paving/Reconstruction, Steel
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This Project consists of in-field structural steel repairs and rehabilitation coating services for Primary Clarifier #3 Center Cage, Truss Rake Arm, and Scum Blade A-Frame. Contractor shall replace a portion of the top center cage and apply coatings as shown in Contract Documents. Contractor shall spot coat items below the water line including the Center Cage, Truss rake arm, Scum blade A-frame.

Details

Division 01 - General Requirements, Vehicular Access and Parking, Traffic Control, Temporary Barriers and Enclosures.
Division 05 - Metals, Structural Metal Framing, Metal Joists, Metal Fabrications.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Paving Specialties, Pavement Markings.
Division 33 - Utilities, Storm Drainage Utilities, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents