Similar Projects
Energy and Engineering Innovation Center - California State University - Bakersfield
New Construction, Infrastructure
Conception
$75,984,000 CJ est. value
Bakersfield, CA 93311

Energy and Engineering Innovation Building - California State University System
New Construction, Infrastructure - 49,000 SF
Conception
$83,175,000 CJ est. value
Bakersfield, CA 93311

AutoZone #5666 / Bakersfield
New Construction, Infrastructure - 7,000 SF
Design
$1,500,000 CJ est. value
Bakersfield, CA 93301

AutoZone #6049 / Bakersfield
New Construction, Infrastructure - 6,500 SF
Design
$1,500,000 CJ est. value
Bakersfield, CA 93311

Kern Community College District - Arvin Educational Center - Measure J Project
New Construction, Infrastructure
Bidding
$40,000,000 CJ est. value
Arvin, CA 93203

Mira Monte High School: Ag Farm Expansion
Infrastructure
Bidding
$980,000 CJ est. value
Bakersfield, CA 93307

2022 Larry Itliong Unity Park
Infrastructure, Renovation
Post-Bid
$3,100,000 CJ est. value
Delano, CA 93215

2022 Delano Aquatic Center
New Construction, Infrastructure - 4,149 SF
Post-Bid
$5,900,000 CJ est. value
Delano, CA 93215

Road Widening on South Fairfax Road From Redbank Road to Shirley Lane
Infrastructure
Results
$412,792 CJ est. value
Bakersfield, CA 93307

(Single-Provider) Positive Location of Underground Utility Facility (Potholing) Services - Kern and King Counties
Infrastructure
Results
$4,500,000 est. value
Bakersfield, CA

Weedpatch Highway and Kimber Avenue Gas Station/C-Store/Retail Development
New Construction, Infrastructure - 9,600 SF
Pending Verification
$2,000,000 CJ est. value
Bakersfield, CA 93307

Renfro Road & Brimhall Road Residential Development
New Construction, Infrastructure
Pending Verification
$148,000,000 CJ est. value
Bakersfield, CA 93314

2-Lane Conventional Highway to a 4-Lane Expressway
Infrastructure
Design
$29,400,000 CJ est. value
Lost Hills, CA 93249

Well No. 21 Site Development Project
Renovation, Infrastructure
Bidding
$2,200,000 CJ est. value
Shafter, CA 93263

Crescent Elementary School - Phase 2 - Building H & J Package
New Construction, Infrastructure - 38,000 SF
Post-Bid
$20,000,000 CJ est. value
Bakersfield, CA 93307

Last Updated 10/11/2022 05:01 PM
Project Title

Student Housing Northeast - Phase 3 - California State University - Bakersfield

Physical Address View project details and contacts
City, State (County) Bakersfield, CA 93314   (Kern County)
Category(s) Heavy and Highway, Residential
Sub-Category(s) Dormitory, Site Development
Contracting Method Competitive Bids
Project Status Seeking Funding, Construction start expected May 2025
Bids Due View project details and contacts
Estimated Value $67,772,000 [brand] Estimate
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

This project is the third phase of the master planned campus housing expansion and will construct a 90,000 ASF/120,000 GSF building (#55) for freshman students with dorm-style single occupant rooms providing 400 beds. The project will be funded through the Systemwide Revenue Bond Program. This project is currently in the California State University's FY 2020/2021 - 2024/2025 CIP. Per the owner, as of October 11, 2022, any construction for student housing is several fiscal years out. The owner states that there are no planning efforts to move forward at the moment this fiscal year or next fiscal year. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

120,000 SF.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents