Similar Projects
SkyHarbour Jet Hangars - Nashville International Airport
New Construction
Conception
$1,400,000,000 est. value
Nashville, TN 37214

Hardeman County Airport William L Whitehurst Field - Terminal Building
New Construction, Infrastructure
Design
$974,000 CJ est. value
Bolivar, TN 38008

Full Service Elevator Maintenance - Memphis District
Term Contract
Design
Memphis, TN 38103

Passenger Boarding Bridges and Associated Equipment, Lighting Maintenance
Term Contract
Post-Bid
Alcoa, TN 37777

McGhee Tyson Airport - Terminal Apron Expansion Project
Addition
Post-Bid
Alcoa, TN 37701

West Star Aviation Site Preparation
Results
Chattanooga, TN 37400

BNA Satellite Concourse Design-Build Proposals
Renovation - 89,000 SF
Results
$75,000,000 est. value
Nashville, TN 37214

Hilton BNA International Hotel
New Construction, Infrastructure - 16,500 SF
Construction
$177,000,000 CJ est. value
Nashville, TN 37214

RFQ Construction Manager at Risk - Terminal Modernization & Seismic Program Concept
New Construction, Infrastructure
Post-Bid
$400,000,000 CJ est. value
Memphis, TN 38116

Concourse Restroom Upgrades
Renovation - 8,600 SF
Results
Nashville, TN 37222

Concourse D Extension CIP
Renovation
Post-Bid
$11,800,000 est. value
Nashville, TN 37214

Design/Build Services East Baggage Makeup Carousel Replacement - Construction
Renovation
Results
Memphis, TN 38116

ARC-Funded Maintenance Building Project
Renovation, Infrastructure
Post-Bid
$95,000 CJ est. value
McMinnville, TN 37110

Concourse Escalator Replacement
Renovation
Results
Blountville, TN 37617

B and C Concourse Upgrades
Renovation
Post-Bid
$2,500,000 CJ est. value
Nashville, TN 37214

Last Updated 09/29/2022 05:11 PM
Project Title

RFP D/B - Consolidated Baggage Modifications in Terminal A and B - Design-Build Construction - Rebid

Physical Address View project details and contacts
City, State (County) Memphis, TN 38116   (Shelby County)
Category(s) Transportation
Sub-Category(s) Airline/Passenger Terminal
Contracting Method Design-Build Firm to Subcontract, Competitive Bids
Project Status Construction start expected November 2022 , Request For Proposals, Construction documents
Bids Due View project details and contacts
Estimated Value $100,000 [brand] Estimate
Plans Available from County Agency
Owner View project details and contacts
Architect View project details and contacts
Description

The owner has determined a prequalified list of design build companies. https://www.bizjournals.com/memphis/news/2022/09/21/memphis-international-airport-rfq-terminal-upgrade.html Sep 21, 2022 The Memphis International Airport has put out a Request for Qualifications (RFP) for a continuation of its Terminal Modernization and Seismic Program (TMSP). It proposes a multiyear, multiphase timeline with a price tag well above the recently completed modernization of Concourse B. The RFQ details seven future potential packages to renovate Memphis International's (MEM) terminal, which could total $700 million to $800 million (including escalation and inflation). It focuses on three core packages that would cost $300 million to $400 million. The RFQ describes the $245 million renovation of Concourse B, which opened in early 2022, as Phase I of the TMSP. The goals of the overall TMSP include "expanding and modernizing MEM's terminal facilities (terminals A, B, and C) to improve life safety including ensuring seismic resiliency as well as fire protection upgrades, meet future demand, reduce environmental impacts through sustainability, improve the customer experience, ensure flexibility as operations evolve, and enhance Americans with Disabilities Act (ADA) access." Scott Brockman, president and CEO of the Memphis-Shelby County Airport Authority (MSCAA), told MBJ that the TMSP will include a partnership with multiple parties. "We don't know what kind of funding we are going to be able to garner from [President Biden's] bipartisan infrastructure law, and what we are trying to do is to build a team," Brockman said. "We don't know until we get through all the funding steps what elements we are going to be able to build at any point of time. We want the designer, contractor, program manager, and a planner to help us make sure that all the pieces that are coming together flow well, and the elements we build today don't get in the way of elements that we want to build next year." Scope of MEM's terminal modernization According to the RFQ the terminal modernization includes: Expanding the face of the terminal Relocating and reconfiguring vertical circulation Reconfiguring the ticket lobby Constructing a Checked Bag Inspection System (CBIS) Expanding the security screening checkpoint Building an employee screening checkpoint Expanding bag claim Preparing an area for a future new FIS (Federal Inspection Station, usually a space for international arrivals). The entire project is split into seven potential packages, ordered in priority of importance, and not phased, as the project is still being designed. The first three packages are the "primary focus" of the project, but "work from any of the seven packages could be included," the RFQ said. The packages are: Package 1 - Terminal face and vertical cores Package 2 - Departures lobby and CBIS Package 3 - Ticket counters and bag make-up Package 4 - Employee screening Package 5 - Security and bag claim Package 6 - Marketplace and domestic/international swing gate Package 7 - FIS Who is involved and who MEM is looking for The project team named in the RFQ so far is the MSCAA board and staff; UrbanArch/Alliance, which also designed the $245 million Concourse B), as principal design firms and sub-consultants; the Transportation Security Administration; and the Federal Aviation Administration. A selection is pending for a planner and program manager. The airport is seeking a Construction Manager At Risk (CMAR) for the project, with the RFQ stating that the airport intends to enter separate contracts for the pre-construction and construction phases of the project. The role of the CMAR during the pre-construction phases mostly boils down to keeping costs down, including helping establish the guaranteed maximum price and the project on-time. During the construction phase, the CMAR manages contractors and subcontractors, oversees coordinating actions, provides quality control, and bonds and insures the construction. The RFQ is seeking a potential CMAR with the ability to provide a performance bond of $240 million, about the same as the entire cost of the Concourse B renovations. Respondents have until 2 p.m. on Sept. 27 to submit qualifications for the project. Finalist interviews, final selection, and awarding of the pre-construction contract are all slated to take place in October, with a Notice to Proceed for pre-construction services coming Nov. 1. There is not yet a construction timeline for the project, but the RFQ said the "goal is to have Phase I construction underway as early in 2023 to meet the requirements and timelines of federal funding." _________________________________________________________ Project No: 20008-T10, 19015.09, 19-1423-10, 19-1423-21, 20008-T21 The Authority is an equal opportunity employer and prohibits discrimination based on the grounds of age, race, sex, color, national origin, disability, marital status, military service, or sexual orientation in its hiring and employment practices and in the admission to, access to, or operation of its programs, services, and activities. Each Proposal must be made by a contractor licensed in Tennessee and be accompanied by a 5% Proposal Guarantee. The successful proposer must execute a Performance Bond and a Payment Bond in the amount of 100% each of the Contract Price and meet the Disadvantaged Business Enterprise (DBE) participation goal for this project, which is 3%. All Proposers are responsible for checking the Authoritys website up to the submission deadline for any updates, addenda or additional information. The successful Proposer must sign a contract with the Authority that includes Federal Aviation Administration provisions, if applicable, regarding the Buy American Preference, Foreign Trade Restriction, Davis-Bacon, Affirmative Action, Debarment and Suspension, and Drug-Free Workplace, all of which are incorporated herein by reference. The Authority reserves the right to reject any or all responses to this Request for Proposals in whole or in part; to waive any informalities, technicalities, or omissions related to this Request for Proposals; and to reject responses on any other basis authorized by the Authoritys purchasing policies.

Details

Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Coiling Doors and Grilles, Entrances and Storefronts, Windows, Special Function Windows, Security Windows, Access Control Hardware, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Acoustic Treatment, Painting.
Division 10 - Specialties, Visual Display Units, Directories, Signage, Telephone Specialties, Compartments and Cubicles, Toilet Compartments, Emergency Aid Specialties, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Lockers, Storage Assemblies, Protective Covers, Flagpoles, Pest Control Devices, Flags and Banners, Security Mirrors and Domes.
Division 11 - Equipment, Loading Dock Equipment, Loading Dock Bumpers, Stationary Loading Dock Equipment, Portable Dock Equipment, Loading Dock Lights, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Art, Casework, Seating.
Division 14 - Conveying Equipment.
Division 21 - Fire Suppression, Instrumentation and Control for Fire-Suppression Systems, Fire-Extinguishing Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Packaged Generator Assemblies, Engine Generators, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting, Lighting Poles and Standards, Parking Lighting, Site Lighting, Walkway Lighting, Flood Lighting.
Division 27 - Communications, Structured Cabling, Data Communications, Voice Communications, Audio-Video Communications, Distributed Audio-Video Communications Systems, Paging Systems, Public Address Systems, Intercommunications and Program Systems.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Speed Bumps, Pavement Markings, Tactile Warning Surfacing, Fences and Gates.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.
Division 41 - Material Processing and Handling Equipment, Conveyors.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents