Similar Projects
Concrete and Paving Services for COTA Owned Properties
Infrastructure, Alteration
Bidding
Columbus, OH

Olentangy Trail - Northmoor Park to Clinton Como Park
Post-Bid
Columbus, OH

Multiuse Trail and Driveway Parking Lot Resurfacing
Infrastructure
Post-Bid
$337,816 est. value
New Albany, OH 43054

Northam Road Shared Use Path
Results
Less than $251,669 est. value
Upper Arlington, OH

Installation of a Rectangular Rapid Flashing Beacon, Pedestrian Crossing with Refuge Island and Associated Curb Ramps
Results
$44,771 est. value
Worthington, OH

UIRF Agler Road Sidewalks
Results
Less than $277,273 est. value
Columbus, OH

UIRF 2016 Sidewalks P2
Results
Less than $1,707,075 est. value
Columbus, OH

Bexley Parking Lot Repairs
Results
Bexley, OH 43209

2020 Sidewalk Maintenance Program
Results
Upper Arlington, OH

Parking Areas - Expo FY20
Results
OH

2020 Sidewalk Reconstruction Program & College Avenue Sidewalk Improvements
Results
$832,000 est. value
Westerville, OH

Pedestrian Safety Neighborhood Sidewalk Gaps, North Linden and South Linden
Results
Less than $312,682 est. value
Columbus, OH

Police Parking Lot Pavement Restoration - Phase 2
Results
Columbus, OH 43215

Grandview Heights Signals Interconnect
Results
Less than $1,156,318 est. value
Grandview Heights, OH 43212

Pedestrian Safety Improvements Sidewalk Nov Program 2020
Results
Columbus, OH

Last Updated 09/16/2021 11:02 AM
Project Title

Ganton Parkway East Phase 2 and Ganton Parkway West Phase 1

Physical Address View project details and contacts
City, State (County) New Albany, OH 43054   (Franklin County)
Category(s) Heavy and Highway
Sub-Category(s) Sidewalks/Parking Lot
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value $2,324,870
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Ganton Parkway East Phase 2 includes widening and resurfacing Ganton Parkway from Worthington Road to a point 2,200 feet south of Worthington Road. Ganton Parkway West Phase 1 includes new road construction from Beech Road to a point 2,200 feet west and widening of Beech Road for a turn lane. Both include roller compacted concrete base, storm sewer, water main, street lighting, street trees, utility duct banks, traffic control signage and striping, and a traffic signal at the intersection of Ganton Parkway and Beech Road.

Details

Division 31 - Earthwork, Earthwork Methods.
Division 32 - Exterior Improvements, Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents