Similar Projects
South Phase - Gantzel Road Phase Ii Extension:Combs To Queen Creek Wash - Cp0518 - City Of Mesa
Alteration
Conception
$1,179,899 est. value
Mesa, AZ 85201

McKellips Road Natural Gas Line: Country Club to Loop 202 - CP0221 - City of Mesa
Infrastructure
Conception
Mesa, AZ 85205

Citywide Meter Vault Improvements Phase IV
Bidding
$162,733 est. value
Glendale, AZ

Durango Campus Landscape and Water Conservation Retrofit
Infrastructure, Alteration
Bidding
Phoenix, AZ 85009

Wastewater Collection System Rehabilitation
Post-Bid
Guadalupe, AZ

Festival Ranch Planning Area 2 Kerry Lane Infrastructure Water Line and Offsite Water Line
Post-Bid
Buckeye, AZ

Professional Services for Loop 101 and Loop 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Loop 101 & 202 Freeway Waterline and Sewer Rehabilitation
Results
Chandler, AZ 85225

Germann Road Waterline
Alteration
Construction
Queen Creek, AZ 85142

Mission Park Improvements - CIPPK22016 - City of Glendale
Renovation, Infrastructure
Conception
$653,093 est. value
Glendale, AZ 85302

Water Treatment Services at All District Sites
Infrastructure
Bidding
Tempe, AZ

Festival Ranch Planning Area 2 Infrastructure Effluent Line
Post-Bid
Sun City, AZ

Tankersley Water Line Replacement Area V - CMAR
Results
Gilbert, AZ 85296

Transmission Mains - Southeast Mesa - CP0828 - City of Mesa
Infrastructure
Conception
$866,058 est. value
Mesa, AZ

Construction Manager at Risk - Mesquite Street Lindsay to Val Vista ST2117 Ka-Lo Park- 29th Place Elliot to Mesquite Street
Infrastructure
Bidding
$5,669,000 est. value
Gilbert, AZ

Last Updated 06/27/2022 03:52 PM
Project Title

Glendale Avenue at 91st Avenue - CIPWW19086 - City Of Glendale -

Physical Address View project details and contacts
City, State (County) Glendale, AZ 85305   (Maricopa County)
Category(s) Sewer and Water
Sub-Category(s) Storm/Sewers, Water Lines
Contracting Method Competitive Bids.
Project Status Conceptual Design
Bids Due View project details and contacts
Estimated Value $2,050,000
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Site work for a water / sewer project in Glendale, Arizona. Conceptual plans call for site work for a water / sewer project. Assess, design and construct new 24" sewer line in Glendale Avenue from 91st to 99th Avenues. As of May 24, 2022, this project is currently in the FY 2023-2032 CIP. Phase 1 of the project nearing completion. Information regarding the design firm and the contractor selection has not been disclosed. A firm timeline has not been established; however, phase two construction is not expected to start prior to 2024. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Details

Division 03 - Concrete, Precast Concrete.
Division 33 - Utilities, Instrumentation and Control for Utilities, Water Utilities, Water Utility Distribution Piping, Water Utility Distribution Equipment, Disinfecting of Water Utility Distribution, Water Utility Storage Tanks, Storm Drainage Utilities, Storm Utility Drainage Piping, Storm Utility Water Drains, Storm Drainage Structures.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents