Similar Projects
Pulte Aquarius
New Construction
Conception
$5,000,000 to $10,000,000 CJ est. value
Stuart, FL 34997

The Bristal at Boca Raton
New Construction, Demolition - 281,399 SF
Conception
Boca Raton, FL 33432

Oak Harbor Somerset House Phase II
New Construction - 27,002 SF
Design
$5,000,000 est. value
Vero Beach, FL 32967

Country Inn Assisted Living Facility
Renovation, Addition - 61,511 SF
Design
$6,500,000 est. value
Pinellas Park, FL 33781

Hampton Manor
New Construction - 81,457 SF
Sub-Bidding
$5,000,000 to $10,000,000 CJ est. value
Fernandina Beach, FL 32034

Orchid Trail Senior Living at Boynton Commons
New Construction - 130,000 SF
Post-Bid
$20,000,000 to $25,000,000 est. value
Boynton Beach, FL 33436

Arborcrest Assisted Living
New Construction - 71,685 SF
Post-Bid
Gainesville, FL 32606

Ground Floor Renovation Phase 1 Titusville Towers
Renovation
Results
Titusville, FL

Green Cove Springs Senior Center Kitchen Alteration
Renovation - 925 SF
Results
Green Cove Springs, FL 32043

Casa Sant` Angelo
New Construction - 180,000 SF
Construction
$17,685,882 est. value
Miramar, FL 33027

Azure of Palm Coast
New Construction - 67,280 SF
Construction
$19,464,475 est. value
Palm Coast, FL

American House
New Construction
Pending Verification
Saint Petersburg, FL 33710

Adventhealth Hospital
New Construction - 174,230 SF
Pending Verification
$1,000,000 to $5,000,000 CJ est. value
New Smyrna Beach, FL

Stoneybrook Senior Independent & Assisted Living
New Construction
Conception
Winter Garden, FL 34787

Canterwood Manor Assisted-Living Facility at DeBary
New Construction - 122,000 SF
Design
DeBary, FL 32713

Last Updated 12/21/2021 08:52 AM
Project Title

Watercrest Assisted Living Facility

Physical Address View project details and contacts
City, State (County) Venice, FL 34293   (Sarasota County)
Category(s) Residential
Sub-Category(s) Assisted Living Facility
Contracting Method
Project Status Obtained from a Public Office, Construction Start Expected first quarter 2023, Construction Completion Expected September 2024
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Details

Assisted Living Facility, 352,587 SF New Construction, 13.98 Acres.
Division 03 - Concrete, Concrete Forming and Accessories, Precast Concrete, Site-Cast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Architectural Woodwork, Architectural Wood Casework.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection, Weather Barriers.
Division 08 - Openings, Doors and Frames, Wood Doors, Plastic Doors, Windows, Hardware, Glazing, Louvers and Vents.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Carpeting, Painting and Coating.
Division 10 - Specialties, Toilet, Bath, and Laundry Accessories.
Division 11 - Equipment, Residential Equipment, Residential Appliances.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Residential Plumbing Fixtures.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting.
Division 27 - Communications, Structured Cabling.
Division 31 - Earthwork, Grading, Excavation and Fill, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents