Similar Projects
VA Tech Innovation Campus - Phase 1
New Construction, Demolition - 1,500,000 SF
Design
$1,000,000,000 est. value
Alexandria, VA

Data Science Facility Construction Document Phase
New Construction
Design
Charlottesville, VA 22903

Huntley Hall Renovation and Addition
Renovation, Addition - 31,404 SF
Bidding
$7,000,000 to $8,000,000 est. value
Richmond, VA 23220

Huntley Hall Renovation and Addition
Renovation, Addition - 31,404 SF
Bidding
$7,000,000 to $8,000,000 est. value
Richmond, VA 23220

Student Wellness Improvements Project
Post-Bid
Blacksburg, VA

Undergraduate Lab Building
Post-Bid
Blacksburg, VA

Gilmer Hall Renovations
Renovation - 160,000 SF
Results
Richmond, VA

Adaptive Innovation and Creativity
Results
Radford, VA

College of Business (COB) and Showker Hall Refurbishment
New Construction, Renovation - 184,000 SF
Construction
$80,000,000 est. value
Harrisonburg, VA

Wilson Hall Renovation
Renovation - 55,480 SF
Construction
$16,800,000 to $20,000,000 est. value
Madison, VA 22807

GMU Expansion - Institute for Digital Innovation
New Construction - 400,000 SF
Pending Verification
$250,000,000 est. value
Arlington, VA 22201

VA Tech Innovation Campus Phase 2 & 3
Pending Verification
Alexandria, VA

Bisdorf Building - Woman's Center Renovation Project
Renovation - 975 SF
Bidding
$1,000,000 to $2,999,999 est. value
Alexandria, VA 22311

Clayton House Renovations
Renovation
Post-Bid
Gloucester Point, VA 23062

Demolish/Replace Daniel Gym and Demolish Harris Hall
Results
Petersburg, VA

Last Updated 12/10/2020 02:17 PM
Project Title

Blow Hall IT Data Center Renovation

Physical Address View project details and contacts
City, State (County) Williamsburg, VA 23187   (Williamsburg City County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method Competitive Bids.
Project Status Results
Bids Due View project details and contacts
Estimated Value
Plans Available from State Agency
Owner View project details and contacts
Architect View project details and contacts
Description

Install new IT racks with in row cooling; install new HVAC system for computer rack cooling to correct the hot and cold aisle air mixing; install redundant power sources - two electrical buses (A&B) for scalability and ease of maintenance: and, for uninterruptible power supply, two new UPSs will be installed and backed up by a new generator power source. The generator will be sized to handle the loads currently on the existing generator, fire pump and building emergency loads.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents