Similar Projects
Mixed-Use Community Center
New Construction - 1,100,000 SF
Conception
$3,000,000,000 est. value
Orange, CA 92856

Fullerton Transportation Center ADA Improvements - 55053
Infrastructure
Conception
$1,000,000 est. value
Fullerton, CA 92832

Dana Point Surf Lodge
New Construction - 59,274 SF
Design
$5,000,000 to $10,000,000 CJ est. value
Dana Point, CA

Magnolia Tank Farm Mixed Use Development
New Construction
Design
$500,000,000 est. value
Huntington Beach, CA 92646

Modify Striping and Signs, Update Curb Ramps and Signals
Infrastructure
Post-Bid
$271,815 est. value
Fullerton, CA

FY 2020/2021 Annual Roadway Resurfacing Project
Alteration
Post-Bid
Dana Point, CA

Place Hma and Perforated Plastic Pipe Underdrain
Infrastructure
Results
$16,200,000 est. value
CA

San Clemente Campground Asphalt Repairs
Infrastructure
Results
$20,000 est. value
San Clemente, CA 92672

San Juan Hills High School Turf Replacement Project
Infrastructure
Construction
$668,535 CJ est. value
San Juan Capistrano, CA 92675

Domingues at McVay Subdivision
New Construction, Infrastructure
Pending Verification
Huntington Beach, CA 92647

South Aircraft Parking Ramp Pavement Rehabilitation - City of Fullerton
Alteration
Conception
Less than $2,200,000 est. value
Fullerton, CA 92833

Cape Seal Project (Measure N)
Term Contract
Design
Visalia, CA

Prospect and Spring Right Turn Lane Modification
Term Contract
Post-Bid
Orange, CA 92869

Transit Asset Management Plan Update
Alteration
Results
$175,000 est. value
CA

Runway Precision Approach Path Indicator - 49015 - City of Fullerton
Renovation, Infrastructure, Alteration
Conception
$250,000 est. value
Fullerton, CA 92833

Last Updated 02/09/2023 12:36 PM
Project Title

Dual Brand Marriott Hotel / Orange

Physical Address View project details and contacts
City, State (County) Orange, CA 92868   (Orange County)
Category(s) Commercial, Heavy and Highway
Sub-Category(s) Hotel/Motel, Paving/Reconstruction, Site Development
Contracting Method Bids by Invitation
Project Status All Sub-Bids Received, Construction start expected May 2023
Bids Due View project details and contacts
Estimated Value $29,496,000 [brand] Estimate
Plans Available from Selected Bidders
Owner View project details and contacts
Architect View project details and contacts
Description

As of February 9, 2023, a building permit has been applied for and is currently pending review. Information regarding the awarded general contractor is not currently available.

Details

5 Stories Above Grade, 196,640 SF.
Division 03 - Concrete, Concrete Forming, Cast-in-Place Concrete, Precast Structural Concrete, Precast Concrete Slabs.
Division 04 - Masonry, Unit Masonry, Concrete Unit Masonry.
Division 05 - Metals, Structural Metal Framing.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry, Millwork.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Weather Barriers.
Division 08 - Openings, Doors and Frames, Entrances and Storefronts, Windows, Mirrors.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Flooring, Resilient Flooring, Carpeting, Wall Coverings, Acoustic Treatment, Painting.
Division 10 - Specialties, Signage, Toilet, Bath, and Laundry Accessories, Fire Protection Specialties, Fire Protection Cabinets, Fire Extinguishers, Flagpoles.
Division 11 - Equipment, Commercial Laundry and Dry Cleaning Equipment, Maintenance Equipment, Ice Machines, Cleaning and Disposal Equipment.
Division 12 - Furnishings, Window Blinds, Curtains and Drapes, Casework, Furnishings and Accessories, Hospitality Furniture.
Division 21 - Fire Suppression, Water-Based Fire-Suppression Systems.
Division 22 - Plumbing, Instrumentation and Control for Plumbing, Facility Water Distribution, Facility Sanitary Sewerage, Plumbing Equipment, Commercial Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Piping and Pumps, HVAC Air Distribution, Central Heating Equipment, Central Cooling Equipment.
Division 26 - Electrical, Medium-Voltage Electrical Distribution, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Structured Cabling, Voice Communications, Call Management.
Division 28 - Electronic Safety and Security.
Division 31 - Earthwork, Site Clearing, Grading, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Asphalt Paving, Rigid Paving, Concrete Paving, Curbs, Gutters, Sidewalks, and Driveways, Paving Specialties, Parking Bumpers, Pavement Markings, Fences and Gates, Planting Irrigation, Planting.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents