Similar Projects
CM at Risk Services for Deferred Maintenance Projects - Wolfson Campus
Design
$7,000,000 to $10,500,000 est. value
Miami, FL 33132

Public-Private Partnership (P3) to Construct and Operate a Research Facility
New Construction - 30,000 SF
Bidding
Lakeland, FL 33868

FIU-CSC CM Consultant
Term Contract
Bidding
$4,000,000 est. value
Miami, FL

Miami Dade College North Campus Artificial Intelligence Center
Sub-Bidding
$2,950,000 to $3,185,000 est. value
Miami, FL 33132

Homestead Campus New Student Success Center
New Construction - 65,000 SF
Post-Bid
Less than $22,865,661 est. value
Homestead, FL 33030

Deferred Maintenance Projects - Kendall Campus - Buildings 100
Post-Bid
$7,000,000 to $10,500,000 est. value
Miami, FL 33176

CM “at Risk” Services
Results
Miami, FL 33132

General Construction Services
Results
Miami, FL 33132

Miami Dade College North Campus Building 7000 + Annex Renovation
Construction
Miami, FL

Miami Dade College West Campus, Structural Improvements Phase IIIA
Construction
Medley, Miami, FL 33178

Miami Dade College Padron Campus – Chiller and Roof Replacement
Renovation
Bidding
Miami, FL 33135

Building 6000 Exterior Waterproofing Project
Post-Bid
Kendall, FL 33176

Risco Park Construction Management at Risk Project
Results
Less than $9,000,000 est. value
Miami Gardens, FL 33056

St.Thomas University - Student Housing
New Construction
Construction
$22,000,000 est. value
Hialeah, FL 33054

Miami-Dade College West Campus Phase III Package C - Interior Build Out
Build-Out - 37,151 SF
Post-Bid
Miami, FL 33178

Reported 12/01/2020 09:44 AM
Project Title

Eduardo J. Padron 11th, 12th, 14th, and 15th Floors Renovation Project

Physical Address View project details and contacts
City, State (County) Miami, FL 33135   (Miami-Dade County)
Category(s) Education
Sub-Category(s) College/University
Contracting Method
Project Status Construction Commenced third quarter 2020, No Sub Bids Needed
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Interior build-out finishes and appearance to match completed floors 7 through 9. The new spaces shall consist of networking labs, makers space, multi-use spaces, small meeting rooms, large classrooms, offices, reception, study rooms, printing / cut room, and other related spaces. In addition, each 11,709 SQFT of floor area will have toilet rooms and all necessary services to include MEP, Fire Protection / Sprinklers, and Data Systems.

Details

Division 02 - Existing Conditions, Demolition, Selective Demolition, Selective Interior Demolition.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Windows.
Division 09 - Finishes, Plaster and Gypsum Board, Ceilings, Flooring, Painting and Coating.
Division 21 - Fire Suppression.
Division 22 - Plumbing.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Instrumentation and Control for HVAC, HVAC Air Distribution.
Division 26 - Electrical, Lighting.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents