Similar Projects
Chick-Fil-A
New Construction - 3,367 SF
Conception
$500,000 to $1,000,000 CJ est. value
Atlanta, GA 30308

I Luv Pho Roswell
Renovation - 5,200 SF
Conception
Roswell, GA 30076

Anderson's Barbecue
Renovation - 2,500 SF
Design
$500,000 est. value
Atlanta, GA

Encore Commons
New Construction - 17,300 SF
Design
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Lee + White
Renovation - 18,292 SF
Bidding by Invitation
$1,590,000 est. value
Atlanta, GA 30310

Chick-fil-A #873
New Construction - 4,980 SF
Post-Bid
$1,000,000 to $5,000,000 CJ est. value
Alpharetta, GA 30022

Jones Peroleum C-Store and Burger King
Renovation - 2,818 SF
Post-Bid
$650,000 est. value
Palmetto, GA 30268

Blue Martini Atlanta
Build-Out - 10,300 SF
Construction
$1,250,000 to $1,500,000 est. value
Atlanta, GA 30305

Moe`s Southwest Grill #0155
Renovation - 2,528 SF
Construction
$384,685 est. value
Atlanta, GA 30361

Flip'd
Renovation - 1,625 SF
Pending Verification
Atlanta, GA 30363

Bayou`Q
Renovation
Pending Verification
Roswell, GA 30075

Caffeine and Octane
Renovation - 6,500 SF
Design
Sandy Springs, GA

Target #T1546 - Cafe Remodel
Renovation - 1,100 SF
Post-Bid
East Point, GA 30344

D Boca N Boca
Build-Out - 1,800 SF
Construction
Atlanta, GA 30312

Starbucks
New Construction
Pending Verification
Atlanta, GA 30308

Reported 01/27/2021 11:03 AM
Project Title

Fado Irish Pub

Physical Address View project details and contacts
City, State (County) Atlanta, GA 30305   (Fulton County)
Category(s) Commercial
Sub-Category(s) Food/Beverage Service
Contracting Method
Project Status Construction Complete as of January 2021
Bids Due View project details and contacts
Estimated Value
Plans Available from
Owner View project details and contacts
Architect View project details and contacts
Description

Work will be done in phases over an 8 week schedule to keep the restaurant open. Areas will be sectioned off for work & completed. Then move to the next phase. This means that not all demo, or painting, etc can be done at the same time as there will be multiple mobilizations per trade. Demo (wall panels), removing hutch from wall without damaging, removing ceiling decor, removing decor above bar. Removing walls. Interior framing (build some new walls & soffits) and millwork (chair rail, molding, crown molding). Note: Millwork finished pieces to be provided by Fado. Will need to move the door opening to the men's room (framing). Minor tile work (due to moving the door). Drywall installation (wall & ceiling). Minor HVAC duct work. Alot of painting. Stain. Wallpaper Hanging. Storefront - bifold or sliding windows to replace existing (GA National already quoted). Electrician to swap out light fixtures. Some new wiring will be necessary. Moving emergency strobe lighting & emergency lights. TV Installation. Wood flooring to feather in to match existing. Decor installation (i.e. hanging pictures, mirrors). Install Stainless Steel counter top / service bars. Glass railing L&M.

Details

Food/Beverage Service, Renovation.
Division 06 - Wood, Plastics, and Composites.
Division 07 - Thermal and Moisture Protection.
Division 08 - Openings.
Division 09 - Finishes.
Division 10 - Specialties.
Division 12 - Furnishings.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC).
Division 26 - Electrical.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents