Similar Projects
Last Updated | 09/14/2020 10:01 AM |
Project Title | Replacement of County Bridge No. 1400-838 on C.R. 699 (Berkshire Valley Road) Over Tributary |
Physical Address | View project details and contacts |
City, State (County) | NJ (Morris County) |
Category(s) | Heavy and Highway |
Sub-Category(s) | Bridge |
Contracting Method | Competitive Bids. |
Project Status | Results |
Bids Due | View project details and contacts |
Estimated Value | |
Plans Available from | |
Owner | View project details and contacts |
Architect | View project details and contacts |
Description | Replacement of County Bridge No. 1400-838 on C.R. 699 (Berkshire Valley Road) over Tributary to Longwood Lake in the Township of Jefferson, Morris County, New Jersey consisting of, but not limited to, 1 LS-Clearing Site Road & Bridge; 1 LS Temporary Cofferdam; 1 LS Coordination With Utilities; 1 LS Traffic Control Devices; 3 Units Temporary Traffic Signal System; 240 SY Removal of Pavement; 800 CY Excavation, Unclassified; 130 SY Course Aggregate, 12” Thk.; 47 LF Precast Concrete Culvert, 3-Sided; 38 CY Precast Concrete Footings; 18 CY Precast Concrete Wing Walls; 6 CY Precast Concrete Pylons; 425 SF Stone Facing; 35 LF Blue Stone Cap; 20 LF Bridge Rail, (1-Bar); 95 SY Waterproofing Membrane; 410 SF Temporary Sheeting, I.& W.D.; 252 LF Concrete Vertical Curb; 2 Units Inlets Type A & D; 95 LF 15” RCP; 165 LF Pre-Stained Galvanized Beam Guide Rail; 25 SY Rip Rap Slope Protection;130 SY Articulated Concrete Block; 35 CY Gabion Wall; 200 SY Milling, 3” or Less, I.&W.D.; 260 SY DGA; 60 Tons HMA Base Course; 52 Tons HMA Surface Course; 1200 LF Traffic Stripes, Thermoplastic; 40 SY Temporary Driveway Access; 125 SY Topsoil, Fertilize & Seed. |
||||||||||||||||||||
Details |
|
||||||||||||||||||||
Bidder's List | View project details and contacts | ||||||||||||||||||||
Prospective Bidders | View project details and contacts | ||||||||||||||||||||
Project Documents |
Engineered Spec Sheet Architectural Plans Other Documents |