Similar Projects
Hinsdale Road Reconstruction - City of Fayetteville
Infrastructure
Conception
$1,394,724 CJ est. value
Fayetteville, NC 28305

Little Cross Creek Greenway - Phases I and II - City of Fayetteville
Infrastructure
Conception
$510,000 CJ est. value
East Fayetteville, NC 28301

StayApt Suites / Fayetteville
New Construction, Infrastructure
Design
$10,000,000 CJ est. value
Fayetteville, NC 28303

COMET Bridge Extension J And A
Infrastructure
Design
$1,000,000 CJ est. value
Fort Bragg, NC 28310

Resurface Various Streets 2024 Phase I
Infrastructure
Bidding
$2,000,000 CJ est. value
East Fayetteville, NC 28301

Grading, Drainage, Paving, Guardrail, and Signals - NC-24
Infrastructure
Bidding
$1,000,000 CJ est. value
Fayetteville, NC 28312

PN92793 JSOC (Joint Special Operations Command ) Operations Facility Annex
New Construction, Infrastructure - 25,260 SF
Post-Bid
$25,000,000 CJ est. value
Fort Bragg, NC 28310

Fayetteville Fire Department New Sub-station No. 4
New Construction, Infrastructure
Post-Bid
$7,300,000 CJ est. value
Fayetteville, NC 28303

Eastover - Central Elementary School Renovation
Alteration
Results
Eastover, NC 28312

Bryant Hall and Vance Hall Building Asbestos Abatement, Demolition and Site Restoration Project
Demolition, Infrastructure, Alteration
Results
Fayetteville, NC

Grading, Drainage, Paving, Signing, Signals, and Structures
Infrastructure
Construction
$151,850,000 CJ est. value
Fayetteville, NC 28306

Taco Bell / Fayetteville
New Construction, Infrastructure - 2,362 SF
Construction
$1,750,000 CJ est. value
Fayetteville, NC 28306

Ashley Academy Replacement - 2016 Bond - Winston-Salem Forsyth County Schools
New Construction
Pending Verification
$9,000,000 est. value
Fayetteville, NC 28304

Taxiway F Pavement and Lighting Rehabilitation - City of Fayetteville
Infrastructure
Conception
$4,000,000 CJ est. value
Fayetteville, NC 28306

Build out Community Living Center Building 72
New Construction, Infrastructure
Design
$5,000,000 CJ est. value
East Fayetteville, NC 28301

Last Updated 06/07/2023 04:17 PM
Project Title

Teresa C. Berrien Elementary School Wing Demolition and Toilet Replacement

Physical Address View project details and contacts
City, State (County) East Fayetteville, NC 28301   (Cumberland County)
Category(s) Education, Heavy and Highway
Sub-Category(s) Elementary School, Site Development
Contracting Method Competitive Bids
Project Status Bidding, Construction start expected July 2023
Bids Due View project details and contacts
Estimated Value $125,000 [brand] Estimate
Plans Available from Architect
Owner View project details and contacts
Architect View project details and contacts
Description

The project's scope of work includes a complete tear down of an existing classroom wing and build back of two group toilets. A Bid Bond will be required along with Performance and Payment Bonds. The Owner reserves the right to reject any and all proposals.

Details

Division 03 - Concrete, Concrete Forming and Accessories, Cast-in-Place Concrete, Precast Concrete.
Division 04 - Masonry, Unit Masonry.
Division 05 - Metals.
Division 06 - Wood, Plastics, and Composites, Rough Carpentry, Finish Carpentry.
Division 07 - Thermal and Moisture Protection, Dampproofing and Waterproofing, Thermal Protection.
Division 08 - Openings, Doors and Frames, Specialty Doors and Frames, Entrances, Storefronts, and Curtain Walls, Windows, Hardware.
Division 09 - Finishes, Plaster and Gypsum Board, Tiling, Ceilings, Resilient Flooring, Carpeting, Painting.
Division 10 - Specialties, Visual Display Units, Chalkboards, Markerboards, Tackboards, Signage, Compartments and Cubicles, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Emergency Aid Specialties, Fire Protection Specialties, Lockers, Flagpoles.
Division 11 - Equipment, Foodservice Equipment, Foodservice Storage Equipment, Food Preparation Equipment, Food Delivery Carts and Conveyors, Food Cooking Equipment, Food Dispensing Equipment, Ice Machines, Educational and Scientific Equipment, Audio-Visual Equipment, Play Field Equipment and Structures.
Division 12 - Furnishings, Casework, Countertops, Office Furniture, Institutional Furniture, Classroom Furniture.
Division 21 - Fire Suppression.
Division 22 - Plumbing, Common Work Results for Plumbing, Plumbing Piping, Plumbing Equipment, Plumbing Fixtures, Drinking Fountains and Water Coolers.
Division 23 - Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, Instrumentation and Control for HVAC, HVAC Air Distribution, Ventilation Hoods, Commercial-Kitchen Hoods.
Division 25 - Integrated Automation.
Division 26 - Electrical, Instrumentation and Control for Electrical Systems, Lighting, Interior Lighting, Emergency Lighting, Exit Signs, Exterior Lighting.
Division 27 - Communications, Common Work Results for Communications, Structured Cabling, Voice Communications, Audio-Video Communications, Audio-Video Systems, Integrated Audio-Video Systems and Equipment, Integrated Audio-Video Systems and Equipment for Classrooms, Distributed Communications and Monitoring Systems.
Division 28 - Electronic Safety and Security, Common Work Results for Electronic Safety and Security, Electronic Access Control and Intrusion Detection, Fire Detection and Alarm.
Division 31 - Earthwork, Common Work Results for Earthwork, Grading, Earthwork Methods, Soil Treatment.
Division 32 - Exterior Improvements, Flexible Paving, Rigid Paving, Fences and Gates, Irrigation, Planting, Turf and Grasses.
Division 33 - Utilities, Water Utilities, Sanitary Sewerage Utilities, Storm Drainage Utilities, Electrical Utilities, Communications Utilities.

Bidder's List View project details and contacts
Prospective Bidders View project details and contacts
Project Documents
 Engineered Spec Sheet
 Architectural Plans
 Other Documents